A technology of substation and rationality, applied in the field of judging the rationality of substation distribution and terminal equipment, can solve the problems of wasting power resources, unable to meet the normal power consumption of surrounding areas, uneven distribution of substations, etc., and achieve the effect of reasonable power supply
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Such as figure 1 As shown, it is a schematic diagram of the steps of the method for judging the rationality of substation distribution provided by the embodiment of the present invention, including:
[0049] In step S101, the information of substations in a preset range is obtained, and the information carries substation identifiers.
[0050] Specifically, this program is written from the server side. The substation is equipped with an information sending module for sending identity information. The information sending module can send it to the server through the mobile communication network. Substation ID is carried in it, which is used to distinguish different substations. The ID can be a number, such as substation 1, substation 2, substation 3, or a letter number, such as substation a, substation b, substation c, of course , other forms of identification are also within the protection scope of this scheme.
[0051] Step S102, sending first response requests to the ...
Embodiment 2
[0081] Such as figure 2 As shown, it is a schematic structural diagram of a substation distribution rationality judgment device provided by an embodiment of the present invention, including:
[0082] Substation information acquisition module 201, configured to acquire substation information in a preset range, the information carrying substation identity;
[0083] The first response request sending module 202 is configured to respectively send a first response request to the substations in the preset range according to the substation ID;
[0084] The first response receiving module 203 is configured to determine the position of the preset range substation according to the received first response if the first response returned by the preset range substation according to the first response request is received;
[0085] Substation distribution determination module 204, configured to determine the distribution of substations in the preset range according to the determined locatio...
Embodiment 3
[0090] Such as image 3 As shown, it is a schematic structural diagram of a substation distribution rationality judgment device provided by an embodiment of the present invention, including:
[0091] Substation information acquisition module 301, configured to acquire substation information in a preset range, the information carrying substation identity;
[0092] A first response request sending module 302, configured to respectively send a first response request to the substations in the preset range according to the substation ID;
[0093] The first response receiving module 303 is configured to determine the position of the preset range substation according to the received first response if the first response returned by the preset range substation according to the first response request is received;
[0094] Substation distribution determination module 304, configured to determine the distribution of substations in the preset range according to the determined location of ...