Computer management system of electric power engineering project

A technology of engineering project and management system, which is applied in the field of computer management system of electric power engineering project, can solve the problems that the time cycle and filing rate of digital photos do not meet the requirements, cannot be clearly grasped by off-site management personnel, and affect the progress of the entire process, etc., to achieve It is conducive to resource sharing, realizing the timeliness of filing, and improving the technical level of personnel

Inactive Publication Date: 2018-07-24
国网山东省电力公司聊城供电公司 +1
View PDF4 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. The location of many engineering projects is very remote. Only a few people know the progress of the project and the actual situation on the site. Every time you find the location of the project, you need a special person to lead the way, and it is impossible for off-site management personnel to supervise and clearly grasp it in a timely manner;
[0004] 2. Digital photo archiving According to the requirements of the State Grid documents, it is necessary to take pictures of specific parts and content, and organize and file them in a timely manner within a week. At pres

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.

[0023] A computerized management system for electric power engineering projects, which includes a project management module, a construction team management module, a project management and control module, an engineering project library module and a basic function module, wherein:

[0024] 1. Project Management Module

[0025] 1. Project basic information management sub-module

[0026] Manage the basic information of the project, and can import or mark the geographic location of the project on the map. By default, the system automatically marks the geographical location of the project on the map according to the entered project address (marked by geographical location search, not accurate).

[0027] 2. Project basic data management sub-module

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a computer management system of an electric power engineering project, comprising a project management module, a construction team management module, a project control module,an engineering project library module, and a basic function module. The construction team management module is used for managing, searching, and evaluating the basic information, enterprise quality and capability of the construction team. The engineering project library module is used for filing, searching and downloading the engineering projects. The basic function module is used for managing system mechanisms, users, and authority distribution. The project control module comprises a project basic information module, a project basic material module, and an engineering project subcontract module. The project control module can help with work like on-site investigation, engineering management, completion acceptance, safety management and monitoring. The invention is advantageous in that theproject position can be clearly and rapidly positioned by project managing staffs; digital photos can be filed in time; work of each departments in the engineering project link can be coordinated, and management efficiency of projects can be improved.

Description

technical field [0001] The invention relates to the field of engineering management systems, in particular to a computer management system for electric power engineering projects. Background technique [0002] The higher-level infrastructure management departments have increasingly strict requirements for construction management. Demonstration projects, high-quality projects, mobile red flags, labor competitions, etc. all put forward higher requirements for refined construction management. Due to factors such as the lack of professionals in the chain, the management method is still very extensive, and there are many weak points that need to be further strengthened. [0003] 1. The location of many engineering projects is very remote. Only a few people know the progress of the project and the actual situation on the site. Every time you find the location of the project, you need a special person to lead the way, and it is impossible for off-site management personnel to superv...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/06G06F17/30
CPCG06F16/93G06Q10/0639G06Q10/103G06Q50/06
Inventor 赵全新周红光时殿军李健裴小文张勇魏延路田保坤柳峰陈凤银郝学华董海涛范新广王云劭王国朋
Owner 国网山东省电力公司聊城供电公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products