A zero-discharge tailings pool system and implementation method
An implementation method and tailings pond technology, which can be applied to dikes, sea area engineering, construction, etc., can solve problems such as inability to clean up sewage and divert streams, and difficult drainage of rainwater
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Step 1: Use survey methods to find out that the permeability coefficient of the bedrock of a tailings pond is less than 1×10-7cm / s, use natural bedrock for anti-seepage, and perform grouting treatment on the positions with cracks to ensure the integrity of the bedrock anti-seepage ;
[0036] Step 2: Build flood interception dam 3 and seepage interception dam 2, build vertical seepage intercepting bodies at the flood interception dam and seepage interception dam, vertically intercept seepage to the bedrock position, and form a complete anti-seepage layer in the reservoir area;
[0037] Step 3: According to the total amount of primary flood outside the reservoir, determine the height of the flood interception dam and the confluence and discharge capacity of the trough-grid slope to ensure that the water outside the reservoir does not enter the reservoir. The surface confluence is intercepted and intercepted by the slope confluence, and the valley confluence is intercepted...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com