Six-pilot-tunnel twelve-step underground space excavation support and protection method
A technology for underground space and pilot tunnels, which is applied in underground chambers, earthwork drilling, wellbore lining, etc. It can solve problems such as low construction efficiency and poor safety, reduce idle work and cross operations, achieve outstanding results, and improve construction efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Taking the underground civil air defense shopping mall with an excavation width of 25.2 meters and a height of 5.6 meters as an example, the excavation and support method of underground space with six pilot holes and twelve steps is used for construction.
[0037] Such as Figure 1-4 As shown, the twelve-step underground space excavation and support method for six pilot tunnels includes steps:
[0038] 1) Advance support construction
[0039] In order to protect the underground pipeline facilities, prevent the sand layer from collapsing and ensure construction safety, auxiliary measures such as advance support for the surrounding rock shall be taken before the construction of the cross passage.
[0040] Before the construction of the cross passage, the front large pipe shed 8 and the small pipe 9 are used for grouting at the position of the straight wall and flat roof of the outer contour line to reinforce the loose surrounding rock, thereby forming a beam and shell ef...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com