Concrete-filled steel tube column and construction method thereof
A technology for steel pipe concrete columns and steel pipe columns, which is applied in the direction of columns, pier columns, pillars, etc., can solve the problems of heavy welding work on the construction site, difficulty in ensuring construction quality, waste of materials and aesthetics, etc., and achieve a large and high proportion of mechanized operations. The effect of promoting application value and saving materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] Embodiment one sees Figure 1-5 As shown, a concrete-filled steel pipe column includes a steel pipe column and core concrete 1 poured inside the steel pipe column. 2. The capital section 3 on the topmost floor.
[0057] The top node area of the column bottom section 2 is provided with a top connection structure, and the top connection structure includes a top stiffening diaphragm 4 provided on the inner wall of the steel pipe column, and the elevation of the top stiffening diaphragm 4 is lower than that of the steel pipe where it is located. The elevation of the top surface of the column, the steel pipe column on the upper side of the top stiffened diaphragm 4 and the top stiffened diaphragm form the top slot.
[0058] The bottom node area of the column top section 3 is provided with a bottom connection structure, and the bottom connection structure includes a bottom stiffening diaphragm 5 provided on the inner wall of the steel pipe column, and the elevation of th...
Embodiment 2
[0081] Embodiment two see Figure 1-7 As shown, in order to increase the column height in this embodiment, the difference compared with the first embodiment is that in addition to the column top section and column bottom section, a standard column section is added in the middle. The steel pipe column section also includes a standard column section 15 arranged between the column bottom section 2 and the column top section 3, the top node area of the standard column section 15 is provided with a top connection structure, and the bottom of the standard column section 15 The node area is provided with a bottom connection structure, the top connection structure and the steel pipe column section on the upper side are also inserted through the bolt column 6 in the node area, and the bottom connection structure and the steel pipe column section on the lower side are also inserted through the bolt column 6 in the node area.
[0082] The difference between the construction method of t...