Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Tunnel construction management method and storage medium

A management method and technology for tunnel construction, applied in data processing applications, instruments, resources, etc., can solve problems such as information can not be transmitted in time, construction management needs are not, and there are few mobile terminals, so as to flexibly grasp the work progress, facilitate construction quality, Easy to check the effect

Inactive Publication Date: 2018-10-19
北京地厚云图科技有限公司
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the vigorous development of construction, whether it is road or railway engineering construction, the annual engineering volume has increased exponentially, and the tunnel engineering construction workload has increased accordingly. However, what is not compatible with it is that engineering construction and The combination of informatization seems very uncoordinated, engineering construction is still in the traditional mode, and both engineering management and data statistics informatization management are relatively backward
[0003] In the construction market, the management of engineering construction has a preliminary trend of information management. However, due to the specialization of engineering construction, the real construction management needs cannot be met by general software.
Due to the high requirements for construction management, some information management software or integrated systems currently on the market cannot adapt to modern construction management. For example, there are many PC-side management software and few mobile terminals. The quality of work cannot be checked and rectified in time, the workload cannot be counted in time, and the performance of workers cannot be automatically assessed in real time, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel construction management method and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] The present embodiment provides a tunnel construction management method, which includes the following steps:

[0024] S10. The first-level user of the construction party creates a work template, and assigns the work template to the work shift group.

[0025] In this embodiment, the first-level user of the construction party may be a user with an authority above that of the construction deputy captain, and construct a certain section of the tunnel project by creating a work template.

[0026] In this embodiment, the content of the work template includes the determination of the work point, the determination of the mileage range of the surrounding rock, the construction method and the determination of the footage, the construction process and other parameters, and the work template has been preset in the system, so as to facilitate construction. Level 1 users create job templates.

[0027] S20. The team leader of the work shift selects a template from the work templates ...

Embodiment 2

[0042] This embodiment provides a storage medium storing a program for executing the method described in Embodiment 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a tunnel construction management method and a storage medium. The tunnel construction management method comprises the steps that a primary user of a construction party createswork templates and assigns the work templates to a construction team; a construction team leader selects a template from the assigned work templates, and generates a work order; a process establishment foreman receives and executes the work order; and an auditor performs audit, the next process is performed when the audit is passed, the process is reset when the audit is not passed, and the previous step is repeated. According to the tunnel construction management method, the tunnel construction management efficiency can be greatly improved; all parties can use mobile terminals to participatein cooperation; and as a construction management party of the primary user, related work templates can be preset, and the work templates comprise construction processes, work points and surrounding rock ranges, so that construction processes, construction quality and construction progress requirements of a construction team can be conveniently normalized, comparison check is facilitated, other project construction participants can know work conditions in real time, and the competitiveness of construction units in the fierce building market is improved.

Description

technical field [0001] The invention relates to building construction management technology and related management fields, in particular to a tunnel construction management method and a storage medium. Background technique [0002] With the vigorous development of construction, whether it is road or railway engineering construction, the annual engineering volume has increased exponentially, and the tunnel engineering construction workload has increased accordingly. However, what is not compatible with it is that engineering construction and The combination of informatization appears to be very uncoordinated, engineering construction is still in the traditional mode, and both engineering management and data statistics informatization management are relatively backward. [0003] In the construction market, the management of engineering construction has a preliminary trend of information management, but due to the specialization of engineering construction, the real constructio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06316G06Q50/08
Inventor 谢远玉薛奇辉单立新肖发权卢一平徐福兵陈小东
Owner 北京地厚云图科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products