Assembly construction method of shield cutter head maintenance well with jacking after semi-excavation
A technology of shield cutter head and construction method, which is applied in shaft equipment, well sinking, earthwork drilling and mining, etc., which can solve problems such as adverse effects of construction, low construction efficiency, and injury to operators, and reduce the workload of excavation and backfilling , Guarantee the safety of construction, and the effect of strong sealing and ring formation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the specific content of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention. The content not described in detail in the embodiments of the present invention belongs to the prior art known to those skilled in the art.
[0029] like Figures 1 to 5 As shown, the embodiment of the present invention provides a half-excavation jacking shield cutter head maintenance well assembly construction method, including:
[0030] Construction pretreatment is carried out at the position where the maintenance well is set; preferably, the pretreatment includes: level...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


