Minisize steel pipe pile pre-stressed anchor rod cable combined support system

A technology of steel pipe piles and anchor cables, applied in the field of micro-steel pipe pile prestressed anchor cable combination support systems, to achieve high reliability, convenient construction, and easy drainage

Pending Publication Date: 2018-11-13
QINGDAO NO 1 CONSTR GRP
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a micro-steel pipe pile prestressed bolt-cable combination support system for many deficiencies in the current traditional foundation pit support, which can effectively solve the problem of deep foundation pit support when there is no grading space. protection issues, to ensure the safety of deep foundation pits and surrounding buildings

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Minisize steel pipe pile pre-stressed anchor rod cable combined support system
  • Minisize steel pipe pile pre-stressed anchor rod cable combined support system
  • Minisize steel pipe pile pre-stressed anchor rod cable combined support system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

[0019] Such as figure 1 , 2 , 3 and 4, the micro-steel pipe pile prestressed anchor cable combination support system includes a crown beam 1 composed of a concrete layer and steel bars arranged on the top of the construction slope, and a plurality of crown beams are arranged at intervals along the length direction of the slope. The two ends are respectively connected to the crown beam 1 and the pipe body 2 at the bottom of the foundation pit. The pipe body 2 is a steel pipe with a diameter of 108mm and a wall thickness of 5mm. After entering, insert the grouting pipe inside the steel pipe, insert the grouting pipe to the bottom of the hole, then retreat 300~500mm, start grouting, pour pure cement slurry with a water-cement ratio of 0.5, and return from the overflow hole at the bottom of the steel pipe. On the other hand, pour contin...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of construction site foundation pit support, in particular to a minisize steel pipe pile pre-stressed anchor rod cable combined support system. The minisize steel pipe pile pre-stressed anchor rod cable combined support system comprises a crown beam. Multiple pipe bodies are arranged in the length direction of a slope surface in a spaced manner. Multiple transverse waist beam connection structures are transversely arranged in the height direction of the slope surface. Multiple longitudinal waist beam connection structures are longitudinally arrangedin the length direction of the slope surface. The transverse waist beam connection structures and the longitudinal waist beam connection structures form a first netlike protection body. A second netlike protection body is arranged below the first netlike protection body. The first netlike protection body and the second netlike protection body are provided with fixing portions. Protection nets arearranged between the first netlike protection body and the pipe bodies as well as between the second netlike protection body and the pipe bodies. The protection nets, the first netlike protection body and the second netlike protection body are provided with concrete protection layers. Each concrete protection layer is provided with multiple drainage portions. The minisize steel pipe pile pre-stressed anchor rod cable combined support system is convenient to construct; a foundation pit side line is easy to control; prestress is applied to an anchor rod cable, and deformation of a side slope iseffectively controlled; and the minisize steel pipe pile pre-stressed anchor rod cable combined support system is high in reliability, obvious in effect and good in application value and popularization value.

Description

technical field [0001] The invention relates to the technical field of construction site foundation pit support, in particular to a micro-steel pipe pile prestressed bolt cable combination support system. Background technique [0002] With the development of urban construction, a large number of high-rise buildings have emerged around the original buildings. Often the construction site is narrow and close to the buildings. The excavation has a great impact on the stability of the slope, and the surrounding environment of the proposed site is complex. When the objects are close, there are many pipelines, and the deep foundation pit support with strict deformation requirements, the traditional grading excavation can no longer meet the requirements of deep foundation pit support, and there are many deficiencies, such as local instability of vertical excavation, excessive Excavation, blasting, rock breaking and unfavorable structural surfaces will cause the risk of slope inversi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/04E02D5/76
CPCE02D5/76E02D17/04
Inventor 高国锋郭诚吴海泉袁传亮柴寿祥
Owner QINGDAO NO 1 CONSTR GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products