Drilling time correction method based on engineering parameters while drilling
A technology of engineering parameters and correction methods, which is applied in the direction of drilling measurement, earthwork drilling and production, drilling equipment, etc., can solve the problems that are difficult to replace and directly applied, the content is not clear enough, and does not correspond, so as to achieve rich geological engineering information and application effect Good effect with wide application prospect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] A drilling time correction method based on engineering parameters while drilling, which uses the variation of drilling time with drilling engineering parameters to calculate the power index based on WOB and rotational speed, and obtains the drilling time correction model based on WOB and rotational speed through the power index. According to the drilling time correction model, the whole drilling time is corrected.
[0034] The specific steps of the method are as follows:
[0035] a. Calculate the power index through the weight on bit and the speed;
[0036] b. Preprocessing power index;
[0037] c. Multiply the power index and the drilling time to be corrected to obtain the drilling time correction model based on the weight on bit and the rotational speed;
[0038] d. Correct the drilling time for the whole section according to the drilling time correction model.
[0039] The power index Calculated by the following formula:
[0040]
[0041] In the above formul...
Embodiment 2
[0050] The present invention is a technical solution for compensating and correcting the drilling time (ROP) based on the engineering parameters in the drilling process including but not limited to the records of the comprehensive mud logging instrument, including the following two aspects: (average) power index ( ), compensation-correction drilling parameters .
[0051] Engineering parameters are usually interrelated, interacting and interacting, as field experience shows, WOB ( ) increases, the drilling time will be accelerated; otherwise, the drilling time will decrease significantly. In the case of ignoring other similar influencing factors or other interference factors that are difficult to quantify, a part of it can be introduced as a correction factor into the mud logging interpretation to increase the participation of engineering parameters and enrich Mud logging interpretation connotation.
[0052] (1) Power index and average power index calculation
[005...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com