Anti-cracking structure and implementation method of asphalt concrete layer under expansion joint of base plate
A technology for asphalt concrete and an implementation method, which is applied to ballast layers, roads, buildings, etc., can solve the problems of the asphalt concrete layer being weak in adapting to low temperature deformation, reducing the temperature strain of the asphalt concrete layer, etc., so as to improve the service performance and reduce the Frictional adhesion, effect of preventing thermal cracks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] like figure 1 , figure 2 , The isolation buffer layer 1 is a rubber cushion, and the shear protection layer 2 is a thin aluminum plate. The specific layout of the structure is as follows:
[0034] First of all, after the construction of the asphalt concrete layer is completed, the length and width range of the base plate and the position of the expansion joint are determined according to the lofting, and the surface of the asphalt concrete layer within 2m on both sides of the expansion joint of the base plate is cleaned. For sharp corners and pits, the cleaning width should be larger than the width of the base plate on both sides, about 15cm.
[0035] Then, the laying of the isolation buffer layer 1 is carried out. The material of the isolation buffer layer 1 is a rubber pad. The thickness is 3-5mm. The isolation buffer layer 1 is laid longitudinally and symmetrically about the expansion joints of the base plate, and the laying length is Lm on the left and right s...
Embodiment 2
[0039] like figure 2 , image 3 , The isolation buffer layer 1 is composed of a buffer layer 3 and an isolation layer 4, and its materials correspond to SBS modified bitumen waterproof membrane and PE film respectively, and the shear protection layer 2 is a thin aluminum plate. The specific layout of the structure is as follows:
[0040] First of all, after the construction of the asphalt concrete layer is completed, the length and width range of the base plate and the position of the expansion joint are determined according to the stakeout, and the surface of the asphalt concrete layer within 2m on both sides of the expansion joint of the base plate is cleaned. For sharp corners and pits, the cleaning width should be larger than the width of the base plate on both sides, about 15cm.
[0041]Secondly, the buffer layer 3 is laid, and its material is SBS modified asphalt waterproof membrane, and the hot-melt method is used for construction, because the hot-melt method can ens...