A technology of soft soil subgrade and lightweight materials, applied in roads, roads, buildings, etc., can solve the problem of lack of macro quantitative control methods, etc., and achieve the effect of solving the problem of jumping at the bridge head of the soft soil subgrade of the operating highway and convenient construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Embodiment 1: the technical solution adopted by the present invention to solve its technical problems is: the operation method of soft soil subgrade bridge head jumping car and filling light material processing method, comprising the following steps:
[0023] The first step is to calculate the weight of the original subgrade excavated by the half section, see figure 1 ;
[0024] The width of half-width subgrade is 3.75m, the length of 55t vehicles is about 10m, the depth of excavated original subgrade is 1.2-1.5m, and the specific gravity of soil-rock subgrade is 2.0t / m 3 , then the total weight of the original half-width subgrade is 3.75*10*(1.2~1.5)*2.0=90~112.5t.
[0025] The second step is to calculate the weight of replacement lightweight materials, see figure 1 ;
[0026] Half width of roadbed is 3.75m, 55t car is about 10m long, excavated original roadbed is 1.2-1.5m deep, and the comprehensive specific gravity of light materials is about 0.8t / m 3 , then the ...