A construction method for a comprehensive pipe gallery in a water-rich area
A construction method and technology of integrated pipe gallery, applied in water conservancy projects, artificial islands, underwater structures, etc., can solve the problems of pipe gallery not being used normally, concrete aging, durability discount, etc., and achieve high durability and enhanced durability performance and increase the service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The construction method described in the present invention will be further described below through specific implementation cases and in conjunction with the accompanying drawings, so as to help those skilled in the art have a more complete, accurate and in-depth understanding of the technical solution of the present invention.
[0032] The design depth of a comprehensive pipe gallery is 2.5m: the pipe gallery is divided into three compartments, namely: natural gas tank, comprehensive tank, and thermal cabin, with net widths of 3m, 3.2m, and 3.2m, and a net height of 2.5m. The construction project will pass through a water-rich and weak soil zone. The groundwater depth is 0.5m. According to the lithological characteristics of the stratum, it can be divided into the following layers, which are layered and described as follows:
[0033] Silty soil: the buried depth of the layer is 3.5m~5.5m, the thickness of the layer is 3.4m~5.4m, it is light gray, gray, flow-plastic, high...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


