Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Intelligent building power management system and method

A power management system and power management technology, applied in data processing applications, handling coins or valuable banknotes, coin-operated equipment for distributing discrete items, etc., can solve the problem of bank transfer system upgrades, which consume a lot of manpower and material resources, and tenants and landlords Problems such as the escalation of conflicts, to achieve the effect of improving the lease relationship and solving labor costs

Pending Publication Date: 2019-02-26
杭州吉租科技有限公司 +1
View PDF0 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the continuous development of society, the rental of office buildings and hotel-style apartments in office buildings and parks has become a new business model. Rental management mainly adopts manual management, which is mainly reflected in the payment of rent and electricity bills. At present, the main difficulty is that the landlord is troublesome in urging the rent of the house. They all rely on manual notices to pay and urge payment. Law approval, financial consolidation, bank transfer system upgrade, etc. are delayed, and sometimes disputes often occur, leading to escalation of conflicts between tenants and landlords
In addition, the management of electricity bills is also quite difficult. The park needs to arrange multiple electricians and maintenance personnel to register the meter reading. Because each tenant moves in at different times, the time period for meter reading is also different. There are several buildings in a park, and there are fewer tenants. Hundreds, even thousands, need to manage the meter reading of so many electric meters, and then notify the electricity bill
In many cases, the manager’s telephone notification is useless, and he has to come to the door to urge the payment. In the end, some have to issue a power outage notice, and force the power outage to cause conflicts. In addition, the traditional power outage mode is to manually switch on the power distribution box or power distribution cabinet. Customers can also send electricity by themselves, failing to achieve the purpose of calling for electricity bills
[0003] Although in the existing technology, many landlords use smart prepaid meters to improve efficiency to a certain extent, and tenants cannot complete power transmission by themselves, the problem they will face is that the prepaid cards used by tenants need to be prepaid by the management department. The recharge amount is not clear during the power consumption process, and the management personnel cannot push messages or call notifications in time. It is often a sudden power outage that makes it impossible to work. Sometimes, many tenants work overtime at night and the power is cut off, which makes them unable to work. Some companies are doing experimental projects at night, and some companies even raise a tank of goldfish and use an oxygen pump to work, which will lead to the termination of the experiment, and the death of the goldfish will cause major economic losses. ; Moreover, many park management departments are not on duty at night, and cannot recharge the electricity bill in the first place. Tenants require the landlord to restore power immediately, and the relevant management personnel can only rush back from home to the unit to handle the recharge business. Unhappy mood, dissatisfied tenants, embarrassing situation where the landlord is wronged; in short, it takes a lot of manpower and material resources to manage the rent and electricity bills of the tenants, and it still fails to achieve the desired effect and cannot be effectively resolved. Managers, landlords, and tenants the contradiction between

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent building power management system and method
  • Intelligent building power management system and method
  • Intelligent building power management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] Embodiment 1: refer to Figure 1-7 . An intelligent building power management system, including an acquisition controller, several power consumption units, several automatic switches and smart meters installed in the power distribution lines of the power consumption units, a power management host computer, a GPRS communication module, and an intelligent terminal;

[0042] The acquisition controller includes a main chip MCU, a memory module, a working power input circuit, a state detection circuit, a clock circuit, a program programming circuit, a display circuit, a button circuit, a GPRS communication module, several control port output circuits and a 485 communication interface, The working power input circuit is connected to the main chip MCU for power supply, and the main chip MCU is respectively connected to each automatic switch through a number of control port output circuits. The chip MCU is electrically connected; the acquisition controller is electrically conn...

Embodiment 2

[0071] Embodiment 2: refer to Figure 1-7 . On the basis of Embodiment 1, the automatic switch includes an intelligent reclosing circuit breaker or a relay. When using the smart reclosing circuit breaker in the intelligent building power management system, when the smart reclosing circuit breaker receives the high-level signal output by the acquisition controller, the internal control module turns on the working power of the motor, and the motor rotates to drive the circuit breaker The operating mechanism of the circuit breaker moves in a directional direction. When the circuit breaker is at the closing position, the control module cuts off the working power of the motor. The operating mechanism is at the closing position and supplies power normally. , the control module also judges that the motor power is turned on, and the motor rotates to drive the operating mechanism to move in a directional direction. The module sends a trip success feedback signal to the acquisition co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an intelligent building power management system and method. The management system comprises a collector power supply circuit, a collecting controller, a plurality of power-using units, a plurality of automatic switches installed in power distribution circuits of the power-using units, intelligent ammeters, an electric charge management upper computer, a GPRS communication module and an intelligent terminal. The collecting controller is electrically connected with all the intelligent ammeters through 485 communication interfaces respectively. A control output port of thecollecting controller is electrically connected with the automatic switches in the power distribution circuits. The collecting controller is connected with the electric charge management upper computer through the GPRS communication module by means of a communication network. The electric charge management upper computer is connected with the intelligent terminal through a communication network.The power switches in the power distribution circuits in the power-using units can be remotely controlled, and the powerful measures of enforced outage can be taken for asking for payment of rental and electric charges when renters own the rental and electric charges.

Description

technical field [0001] The invention relates to a power management system, in particular to an intelligent building power management system and a management method thereof. Background technique [0002] With the continuous development of society, the rental of office buildings and hotel-style apartments in office buildings and parks has become a new business model. Rental management mainly adopts manual management, which is mainly reflected in the payment of rent and electricity bills. At present, the main difficulty is that the landlord is troublesome in urging the rent of the house. They all rely on manual notices to pay and urge payment. Law approval, financial consolidation, bank transfer system upgrades and other reasons are delayed, and sometimes disputes often occur, leading to the escalation of conflicts between tenants and landlords. In addition, the management of electricity bills is also quite difficult. The park needs to arrange multiple electricians and mainten...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G07F15/00G07F15/06G07F15/10G06Q30/06
CPCG06Q30/0645G07F15/003G07F15/06G07F15/10
Inventor 姚松军章财丰方军刘梦翔姚瑜锋郑晓锋姚瑶吴琼
Owner 杭州吉租科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products