Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Compound temporary blocking steering fracturing method capable of improving productivity of sandstone reservoir gas well

A technology for reservoir and sandstone, which is applied in the field of compound temporary plugging and diverting fracturing to improve the productivity of gas wells in sandstone reservoirs, can solve the problems of difficult diverting cracks, weak controllability, formation damage, etc. The construction is simple and the effect of improving the transformation effect

Inactive Publication Date: 2019-03-12
PETROCHINA CO LTD
View PDF8 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The purpose of the present invention is to overcome the deficiencies of the above-mentioned prior art, to provide a composite temporary plugging diversion fracturing method for improving the productivity of gas wells in sandstone reservoirs, and to overcome 1 in the prior art: the presence of both chemical temporary plugging agents and fiber temporary plugging agents The controllability is weak, the increase of fracture extension pressure is not large, the fracture turning extension is not obvious, and turning fractures are not easy to form. 2: The chemical temporary plugging materials cannot be completely degraded, and it is easy to cause great damage to the formation, and the fracture conductivity cannot be greatly improved Ability, 3: Fiber temporary plugging agent has poor plugging ability, fractures are easy to break through, and the effect of improving fracturing stimulation is not obvious, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Compound temporary blocking steering fracturing method capable of improving productivity of sandstone reservoir gas well
  • Compound temporary blocking steering fracturing method capable of improving productivity of sandstone reservoir gas well
  • Compound temporary blocking steering fracturing method capable of improving productivity of sandstone reservoir gas well

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0056] It should be noted that the structures, proportions, sizes, etc. shown in the drawings attached to this specification are only used to match the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not used to limit the implementation of the present invention Any modification of the structure, change of the proportional relationship or adjustment of the size shall still fall within the scope of the technical content disclosed in the present invention without affecting the effect and purpose of the present invention. In the range.

[0057] At the same time, terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit this specification. The practicable scope of the invention and the change or adjustment of its relative relationship shall also be regarded as the practicable scope of the present inventi...

Embodiment 1

[0059] The invention discloses a compound temporary plugging diversion fracturing method for increasing the productivity of gas wells in sandstone reservoirs, comprising the following steps:

[0060] Step 1) Selecting gas wells and sandstone reservoirs in modified sandstone reservoirs that can implement temporary plugging and diversion fracturing;

[0061] Step 2) According to step 1), the geological data of the modified sandstone reservoir gas well and the modified sandstone reservoir and the production dynamic data of adjacent wells, wherein the modified sandstone reservoir gas well and the geological data of the modified sandstone reservoir include the effective thickness of the reservoir, sand Reservoir physical parameters of body thickness, well logging and mud logging interpretation. The production performance data of adjacent wells include the production and pressure change curves of adjacent wells with similar geological conditions. Combined with the simulation calculat...

Embodiment 2

[0067] The invention discloses a compound temporary plugging diversion fracturing method for increasing the productivity of gas wells in sandstone reservoirs, comprising the following steps:

[0068] Step 1) Selecting gas wells and sandstone reservoirs in modified sandstone reservoirs that can implement temporary plugging and diversion fracturing;

[0069] Step 2) According to step 1), the geological data of the modified sandstone reservoir gas well and the modified sandstone reservoir and the production dynamic data of adjacent wells, wherein the modified sandstone reservoir gas well and the geological data of the modified sandstone reservoir include the effective thickness of the reservoir, sand Reservoir physical parameters of body thickness, well logging and mud logging interpretation. The production performance data of adjacent wells include the production and pressure change curves of adjacent wells with similar geological conditions. Combined with the simulation calculat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
densityaaaaaaaaaa
viscosityaaaaaaaaaa
heightaaaaaaaaaa
Login to View More

Abstract

The invention discloses a compound temporary blocking steering fracturing method capable of improving the productivity of a sandstone reservoir gas well. The method comprises the following steps that1, according to the reservoir stress data, micro-crack development conditions and reservoir brittleness data of the sandstone reservoir gas well, a transformed sandstone reservoir gas well and a transformed sandstone reservoir both of which can be subjected to temporary blocking steering fracturing are selected; 2, according to geological data of the sandstone reservoir gas well and production dynamic data of an adjacent well, in combination with fracturing analysis software for simulation calculation, fracturing construction parameters are determined; 3, the dosage of a composite temporary blocking agent is calculated, wherein the composite temporary blocking agent is composed of a foam temporary blocking agent and a fiber temporary blocking agent, and the dosage of the fiber temporary blocking agent is 3%o of the mass fraction of the foam temporary blocking agent; 4, pump injection construction steps are set, and a fracturing construction pump sequence is designed; 5, a foam temporary blocking agent work liquid is prepared; 6, main fracturing construction is carried out, the composite temporary blocking agent is used for blocking original cracks of the sandstone reservoir gas well, the cracks are subjected to steering, and then construction at a steering fracturing stage is carried out.

Description

technical field [0001] The invention belongs to the technical field of gas well fracturing, and in particular relates to a compound temporary plugging and diverting fracturing method for improving the productivity of gas wells in sandstone reservoirs. Background technique [0002] Fracturing is an important way to transform low-permeability oil and gas reservoirs and realize profitable development. Temporary plugging and diversion fracturing technology can seal the original fractures, realize fracture diversion, and form new fractures, thereby forming a complex fracture network system and increasing gas well drainage area to achieve the purpose of gas well stimulation. [0003] The conventional temporary plugging diversion fracturing method is to inject a chemical temporary plugging agent during the fracturing process to temporarily plug the fractures and force the fractures to divert and extend. Currently, the most widely used temporary plugging agents are chemical tempora...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21B43/267E21B33/13C09K8/514C09K8/508
CPCC09K8/508C09K8/514E21B33/13E21B43/261E21B43/267
Inventor 牟春国李宪文白建文古永红叶亮邝聃丁勇何平韩巧荣崔云群
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products