Manufacture mould and manufacture method for rectifier square bridge
A technology for manufacturing molds and molds, which is applied in the field of manufacturing molds for rectifier square bridges and its manufacturing field, can solve the problems of dislocation welding and inconvenience of welding points, and achieve the effects of improving yield rate, accurate positioning and saving resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] like figure 1 As shown, the present invention provides a rectifying square bridge manufacturing mold, which includes two first mold 1 and second mold 2 that are installed in cooperation with each other.
[0040] like Figure 2 to Figure 5 As shown, the top surface of the first mold 1 is evenly distributed with a frame mechanism 11, and the frame mechanism 11 includes a square positioning rod 12 and a first pin hole 13, a second pin hole 14, and a symmetrical distribution centered on the square positioning rod 12. The third pin hole 15 and the fourth pin hole 16, the first lead frame 131 is clamped in the first pin hole 13, the second lead frame 141 is clamped in the second pin hole 14, and the third lead frame 141 is clamped in the second pin hole 14. A third lead frame 151 is clamped in the pin hole 15, and a fourth lead frame 161 is clamped in the fourth pin hole 16;
[0041] There is a connecting hole 121 matched with the connecting shaft 22 inside the square posit...
Embodiment 2
[0053] The invention provides a manufacturing method using the manufacturing mold to manufacture a rectifying square bridge, the manufacturing method comprising the following steps:
[0054] Step 1: Insert the pin piece 1312 into the q-shaped hole 1311, the b-shaped hole 1511 and the inverted b-shaped hole 1611 respectively;
[0055] Step 2: Place the second mold 2 on the glue dispenser, and use the glue dispenser to dispense glue on the first glue dispensing station 241 and the second glue dispensing station 2311;
[0056] Step 3: Remove the second mold 2 from the dispenser, match the second mold 2 with the first mold 1, insert the connecting shaft 22 into the connecting hole 121, and screw the positioning column 18 into the second positioning hole 27 to obtain a complete mold ;
[0057] Step 4: Put the complete mold into the welding furnace, keep the welding temperature at 320°C, and the welding time for 3 minutes, so that the lead pieces 1312 are respectively welded to the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



