Construction method for rectangular and variable section hollow pier of bridge

A construction method and hollow pier technology, applied in bridges, bridge parts, bridge materials, etc., can solve the problems of slow formwork turnover, long construction period, and large formwork input, and achieve short construction period, fast formwork turnover, and less formwork input. Effect

Inactive Publication Date: 2019-03-19
CHINA RAILWAY 19TH BUREAU GRP SECOND ENG CO LTD
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing construction method of hollow piers with rectangular variable cross-sections for bridges has problems such as long construction period, cumbersome procedures, large formwork investment, and slow formwork turnover.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The bottom dimension of the outer section of the rectangular variable-section hollow pier (direction along the bridge × cross-bridge direction) is 6.0m×B (B=2.0+H / 80×2, H is the height of the pier column, unit: m), and the top dimension (direction along the bridge × horizontal bridge direction) 6.0m × 2.0m, the chamfer size of the inner box body is 30cm × 30cm, the pier bottom 2.5m and pier top 2.5m are solid pier parts, and the slope ratio of the inner and outer walls of the transverse bridge is 1:80.

[0019] Lay out the 2.5m-high formwork on the top of the platform, and pour the 2.5m-high solid section at the bottom of the pier; the solid section formwork will not be dismantled after the concrete is poured, and the stiff skeleton will be used to position and bind the steel bars of the pier body, and use a crane to place it on the top of the solid section formwork Install and support the 4.5m-high inner and outer formwork of Sections 1 and 2, pour the pier body concret...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a rectangular and variable section hollow pier of a bridge, and relates to the field of bridge construction. The main aim is to solve the problems that an existing construction method is long in construction period, slow in formwork transfer and the like. Pier body steel bars are bound, a pier body solid segment formwork is installed, and pier bodyconcrete is cast; after the concrete is cast, the solid segment formwork is not detached and connected with long stiff skeletons, first and second segment inner and outer formworks are installed anderected on the top of the solid segment formwork, and first and second segment pier body concrete is cast; after a second pier body is constructed, pier body steel bars are bound, the solid segment formwork and the first segment formwork are first disassembled, then the second segment formwork is not disassembled temporarily, third and fourth segment formworks are sequentially installed and erected on the top of the second formwork, and pier body concrete is cast; two PVC tubes are pre-buried in a pier body, two steel rods penetrate into the PVC tubes, joist steel is placed on cantilevers of the steel rods, square timber and bottom formworks are laid on the joist steel, bent cap steel bars are bound, side formworks are closed, and concrete is cast. The construction method has the advantages that the construction period is short, and formwork transfer is rapid.

Description

Technical field: [0001] The invention relates to the field of bridge construction, in particular to a construction method for a hollow pier with a rectangular variable section of a bridge. Background technique: [0002] The pier body structure of the variable cross-section hollow pier consists of three parts: the upper solid section, the hollow section, and the lower solid section. In view of the thin wall and high pier of the hollow bridge pier, the concrete pouring construction is relatively difficult, so the concrete pouring of the pier body is divided into three constructions: the first construction of the lower solid section and part of the hollow section, the second construction of the remaining hollow part, and the third construction of the upper solid section construction. At present, the commonly used construction method is: after the first pouring of the pier body concrete is completed, the formwork is not removed, the scaffolding is directly erected, the second s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01D19/02
CPCE01D19/02E01D21/00E01D2101/26
Inventor 崔志成全宗坤王东明司伟峰白君才李润双刘福春
Owner CHINA RAILWAY 19TH BUREAU GRP SECOND ENG CO LTD