Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

An electric power capital construction on-site communication calling method and system

A calling method and infrastructure technology, applied in the field of on-site communication, can solve problems such as damaged signs, difficult identification, and difficulty in effective supervision of service quality, and achieve the effect of convenient communication and improved response efficiency

Inactive Publication Date: 2019-05-28
黄冈东源电业集团有限公司建设分公司 +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Power outage service at the construction site involves unlocking the distribution box, power connection and power outage. It is necessary to contact the person in charge of the distribution box management. Now the usual practice is to go to the construction project department office to directly contact the management personnel or contact the phone or mobile phone. One-to-one contact, the quality of service is difficult to be effectively supervised
At the same time, the distribution box is placed in the open air, and the logo on the box is often damaged and difficult to identify. It is difficult for users to tell the exact location or contact the direct person, which fails to meet the requirements of fast service for customers.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • An electric power capital construction on-site communication calling method and system
  • An electric power capital construction on-site communication calling method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] Such as figure 1 As shown, it is only one of the embodiments of the present invention. The present invention provides a method for on-site communication and calling of electric power infrastructure. The method includes the following steps:

[0042] S1: Establish the main server, and log in the display device and mobile device in the control room to the main server;

[0043] Establish the main server to process the on-site communication calls of the electric power infrastructure;

[0044] And it is necessary to ensure that the display device in the control room and the mobile device are connected to the main server, so that any call information can be processed in time.

[0045] S2: Obtain the calling device number and its physical address in the calling device signal;

[0046] The main server side obtains the call signal in real time. The call signal is sent by the call device installed in the distribution box. The information sent by the call device includes the numb...

Embodiment 2

[0058] still as figure 1 As shown, it is still one of the embodiments of the present invention. In order to make a power infrastructure on-site communication calling method of the present invention more practical and stable, and the control is more convenient, the present invention also has the following designs:

[0059] First, when step S1 is executed, both the display device and the mobile device in the control room need to log in to the main server through account and password verification.

[0060] Authentication is required to prevent other irrelevant devices from being connected to the general server and affect the efficiency of calls; in addition, managers can use different mobile devices to log in to the general server through this account and password to facilitate management.

[0061] In addition, before step S2 is executed, the number of the calling device and the information of the distribution box are recorded and stored in one-to-one correspondence.

[0062] Ge...

Embodiment 3

[0072] Such as figure 2 As shown, on the other hand, the present invention also provides an on-site communication calling system for electric power infrastructure, which includes:

[0073] login module;

[0074] Signal acquisition module;

[0075] Judgment module;

[0076] sending module;

[0077] display module;

[0078] The display device and mobile device in the control room log in to the general server through the login module, and the general server obtains the calling device number and its physical address in the calling device signal through the signal acquisition module, and the general server judges the received calling device according to the judging module Whether the physical address information has been stored in the calling device record table, if it has been stored in the calling device record table, then the calling device number is sent to the control room display device and mobile equipment through the sending module, and displayed through the display mo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an electric power capital construction field communication calling method and system, and relates to the technical field of field communication, the electric power capital construction field communication calling method comprises the following steps: S1, establishing a total server side, and logging in a control room display device and mobile equipment to the total server side; S2, acquiring a calling device number and a physical address of the calling device number in the calling device signal; S3, enabling the master server to judge whether the received physical address information of the calling device is stored in a calling device record table, and if the received physical address information of the calling device is stored in the calling device record table, executing the step S4; And S4, sending the calling device number to a control room display device and mobile equipment for display. The electric power capital construction site communication calling method and system are simple, practical and convenient to communicate, one person is required to know multiple persons, the two receivers are independent of each other and do not interfere with each other, workers can cooperate with each other conveniently, and the response efficiency of temporary power utilization requests of the capital construction site is improved.

Description

technical field [0001] The invention relates to the technical field of field communication, [0002] In particular, the present invention relates to a calling method and system for on-site communication of electric power infrastructure. Background technique [0003] With the development and progress of society, the construction of cities is changing with each passing day. The number of infrastructure projects continues to increase, and the size of individual construction sites is also becoming larger. A large infrastructure construction site may require more than a dozen or even dozens of distribution boxes. As far as the power transmission and transformation projects of the State Grid Corporation are concerned, the construction site of a 110kV substation is generally equipped with at least 4-6 distribution boxes, and there are more distribution boxes at construction sites with high voltage levels such as 220kV and 500kV. [0004] Article 12.0.6 of the "Safety Specificati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04L29/06H04L29/08H04M11/02H04M11/04
Inventor 姜清华陈长安卓俊帆胡骏程楚强杨坤明杨坤李宁
Owner 黄冈东源电业集团有限公司建设分公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products