A construction technique for leading ropes in the process of replacing mine hoisting ropes
A construction technology and hoisting rope technology, which is applied in mine lifting equipment, transportation and packaging, etc., can solve problems such as lack of rope-leading technology, and achieve the effect of shortening the rope-leading time and improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A construction technique for changing the leading rope in the process of hoisting the first rope in a mine, including:
[0032] Step S1: stop the container II on the wellhead platform, and stop the container I on the other side on the bottom platform;
[0033] Step S2: Lead the traction rope to a position higher than the wellhead, and fix the end of the traction rope with the old rope that needs to be replaced;
[0034] Step S3: Disconnect the old rope to be replaced from the container II;
[0035] Step S4: The hoist runs forward, lowers the container II, and at the same time, continuously recovers the traction rope to the outside of the wellhead, leads the disconnected old rope to the outside of the wellhead, and when the connection between the traction rope and the old rope falls to the wellhead position , the hoist stops running;
[0036] Step S5: The connection between the end of the traction rope and the old rope is released, the traction rope is withdrawn, and t...
Embodiment 2
[0042] In this embodiment, the equipment involved in the leading rope process mainly includes the guide pulley 3, the rope changing device 4 and the traction winch 5, the rope reel of the traction rope 10 is installed on the traction winch 5, the rope changing device 4 is arranged at the wellhead, and the guide rope The wheel 3 is close to the hoisting head rope, and the traction winch 5 is installed behind the rope changing device 4 , and a rope reel of a traction rope 10 is installed on the traction winch 5 .
[0043] Such as figure 1 , figure 2 , image 3 , Figure 4 Shown is a construction technique for changing the leading rope in the process of hoisting the first rope in a mine, including the following steps:
[0044] Step 1: Put the rope changing device 4, the guide wheel 3 and the traction winch 5 in place, stop the container II6 on the side close to the rope changing device 4 at the wellhead platform, and stop the container I7 on the other side at the well bottom ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com