A technology of power generation control and coordination optimization, applied in the direction of single-network parallel feeding arrangement, etc., can solve problems such as complex safety and stability characteristics, increase of random factors, and insufficient flexible adjustment of power supply
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] The embodiment of the present invention provides a decision-making method based on coordinated optimization of power generation control at two time points, assuming that the current operating time of the power grid is t 0 , the current operating state of the power grid is S 0 , the real-time power generation control period is T, and the set of power plants that perform real-time power generation control according to the optimization decision of the control center is A;
[0053] like figure 1 As shown, the method specifically includes the following steps:
[0054] S1, obtain the sensitivity of the active power injected into the grid by each power plant, load, DC system AC side node and external contact node in the power grid under the jurisdiction of the control center to the power transmission equipment and stable section active power that the control center is responsible for monitoring; in the embodiment of the present invention In a specific implementation manner, ...
Embodiment 2
[0096] Based on the same inventive concept as in Embodiment 1, the embodiment of the present invention provides a decision-making device for coordinating and optimizing power generation control based on two time points, including:
[0097] Diversity module for obtaining t 0 The initial value of the active power control command of each power plant in time A at +T, t 0 The initial value of the active power control command of each power plant in A at +2T time and the corresponding active power control command optimization decision equation, the set of power plants that meet the active power regulation speed requirements is recorded as B, and the power plant t in B is 0 +T moment, t 0 The initial value of the active power control command at +2T is taken as the corresponding power plant t 0 +T moment, t 0 The final value of the active control command at +2T time, the set of power plants in A except the power plants in B is recorded as C; where, t 0 Indicates the current running...
Embodiment 3
[0104] Based on the same inventive concept as in Embodiment 1, the embodiment of the present invention provides a decision system for coordinating and optimizing power generation control based on two time points, including:
[0105] a processor adapted to implement the instructions; and
[0106] The storage device is suitable for storing a plurality of instructions, and the instructions are suitable for being loaded by the processor and executing the steps described in any one of Embodiment 1.
[0107] Those skilled in the art should understand that the embodiments of the present application may be provided as methods, systems, or computer program products. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (in...