Pneumatic caisson excavation device and use method thereof
A caisson and air pressure technology, which is applied to the operation methods of caissons, excavators/dredgers, earth movers/shovels, etc., can solve the problems of low construction efficiency of caissons, difficulties in manual operations, and inability to quickly fetch soil from large caissons And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] see Figure 1-3 , air pressure caisson excavation device, it comprises caisson body 4, and the sealing partition 5 that is used for sealing the bottom of caisson body 4 is airtightly fixed on the lower inner wall of described caisson body 4, the bottom of described sealing partition 5 A plurality of cantilever excavators 6 are fixedly installed on the end surface, and the slag discharge channel 11 and the compressed air pipe 10 are communicated on the sealing partition 5, and the bottom end surface of the sealing partition 5 is installed with a The monitoring camera 13 and the pressure sensor 14 used to monitor the pressure of the sealed cavity at the bottom of the caisson body 4, the cantilever excavator 6, the camera 13 and the pressure sensor 14 communicate with the industrial system for controlling its work through the signal line 3 respectively. Computer 2 is connected. By adopting the excavation device with the above structure, the support condition of the caisso...
Embodiment 2
[0040] The using method of any one of the air pressure caisson excavation device may further comprise the steps:
[0041] Step 1: Install a sealing partition 5 at the bottom of the caisson body 4, and arrange a plurality of cantilever excavators 6 symmetrically and evenly along the center of the caisson body 4 under the sealing partition 5;
[0042] Step 2: install the compressed air pipe 10 and connect it with the air compressor 16, and use helium mixed gas to form a high-pressure sealing area between the sealing partition 5 and the excavation foundation 7;
[0043] Step 3: Control the corresponding cantilever excavator 6 through the industrial computer 2, and adjust the vertical angle and horizontal direction of the cantilever excavator 6 to carry out excavation and soil removal operations;
[0044] Step 4: At the same time as the soil extraction operation, the excavated soil in the high-pressure sealing area is extracted and discharged to the outside of the caisson body 4 b...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com