A pebble layer and large particle size technology, which is applied in infrastructure engineering, construction, etc., can solve the problems of lack of empirical data, scheme feasibility, and unpredictable construction efficiency, etc., to improve the construction process, high strength, and excellent stability Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The present invention will be further described below in conjunction with the accompanying drawings and examples.
[0020] Such as Figure 1 to Figure 4 Shown, the method for cofferdam construction in the river bed A of large particle size pebble layer comprises the following steps,
[0021] D. Drill the steel casing 1, use the drilling rig to punch holes in the riverbed A in the steel casing 1, and fill the steel casing 1 with sandbags 2 to the riverbed A after punching.
[0022] E. Pull out the steel casing 1.
[0023] F. Setting positioning piles 3 on the riverbed A filled with sandbags 2; the positioning piles 3 are distributed in a ring. The outer diameter of the steel casing 1 is larger than that of the positioning pile 3 . In this embodiment, the large-diameter steel casing 1 is first used to impact the riverbed A of the large-diameter pebble layer. The large-diameter pebbles are crushed by the impact and washed away with the water flow, and then the steel cas...