Pulley type positive hanging hoist installing structure for climbing frame lifting
A technology for installing structures and pulleys, which is applied in the direction of building structure support, building structure support, building structure support scaffolding, etc., can solve the problems of upside-down hoist damage, high installation costs, and affecting construction operations, etc., and achieve stable lifting and lowering of climbing frames. The effect of not affecting friction and eliminating potential safety hazards
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] like Figure 1 to Figure 6 As shown, the present invention discloses a pulley type hanging hoist installation structure for lifting the climbing frame. The lifting point 1 is installed at the high position of the climbing frame 4, and a hanging hoist 6 and an upper sprocket 11 are installed on the hanging point 1. In the middle position of the climbing frame 4, the middle hanging point 2 is installed, and the middle hanging point 2 is fixed on the building wall (not shown in the figure); the middle position of the climbing frame 4 is also suspended with a suspension wheel 7, and the suspension wheel 7 There is an upper fulcrum 71 above the top of the suspension wheel 7, and a lower fulcrum 72 is provided below the suspension wheel 7; the lower suspension point 3 is installed at the low position of the climbing frame 4, and the lower suspension point 3 is pivotally connected with a pulley 31; one end of the chain 5 is fixed on the suspension wheel 7. On the upper fulcrum...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


