Raft type foundation pit water level control method based on BIM technology
A water level control and raft technology, which is applied to the construction field, can solve problems such as affecting the stability and quality of the building, increasing the submersible pumping time, and indeterminate control, so as to ensure effective construction, convenient operation and reduce working time. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0013] The present invention is described in further detail now in conjunction with accompanying drawing. The accompanying drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, so that they only show the components relevant to the present invention.
[0014] see figure 1 , a method for controlling the water level of a raft foundation pit based on BIM technology, characterized in that the steps are:
[0015] (1), in the deep foundation pit 2 in the ground 1, before using building materials to build the building 4, the water in the dewatering well 3 is discharged through the drain pipe 6 through the submersible pump 5 in the dewatering well 3, and the water in the dewatering well 3 is discharged through the drainage pipe 6. 3. The pressure sensor 7 at the bottom determines the water surface 10 of the dewatering well, so that the water surface 10 of the dewatering well is two meters lower than the bo...