Cooperative operation method for quay crane, container truck and field bridge under dual-load cycle
A kind of operation and dual technology, applied in the field of cooperative operation of quay crane, truck, yard and bridge, can solve the problems of simultaneous loading and unloading technology of the same shell and less research on the mixed stacking strategy of the storage yard
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0122] The technical solutions of the present invention will be fully described below in conjunction with the accompanying drawings and examples of implementation.
[0123] like figure 1 As shown, the present invention provides a method for cooperative operation of quay cranes, trucks, yards, and bridges under double load cycles based on an improved greedy algorithm. The method includes:
[0124] Step 1: Input original information and parameters, including the arrival time and order of ships, container stowage information on ships, container stowage information in yards, and related information of various equipment.
[0125] Step 2: Assign the number of quay cranes to arriving ships in sequence based on the principle of the least number of quay cranes;
[0126] Step 3: Determine the loading and unloading sequence for the import and export containers of the ship based on the principle of matching the highest degree of confusion;
[0127] Step 4: Allocate the number of trucks ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com