Prefabricated door and window integrated overlapped wall plate and manufacturing method thereof
A door, window and wall panel technology, which is applied in the field of prefabricated door and window integrated laminated wall panels and its production, can solve problems such as troublesome replacement of door and window frames, and achieve the effects of saving cost and installation cost, simplifying structure and installation, and facilitating replacement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Such as figure 1 As shown, this embodiment provides a prefabricated door and window integrated laminated wall panel 1, which includes a first prefabricated layer 11, a second prefabricated layer 12, a concrete layer 13, a formed reinforcement cage 14, a pre-embedded fixture 15, a sealing Side panel 16 and door and window frame. The first prefabricated layer 11 and the second prefabricated layer 12 are respectively arranged on both sides of the concrete layer 13 to form a laminated wallboard 1 , and the molded reinforcement cage 14 is embedded in the laminated wallboard 1 . The formed reinforcement cage 14 is embedded in the first prefabricated layer 11 , the second precast layer 12 and the concrete layer 13 at the same time, as the skeleton of the laminated wall panel 1 , and is used to enhance the structural support strength of the laminated wall panel 1 .
[0051] Door and window holes are formed on the laminated wall panel 1, and the embedded fixing parts 15 are arr...
Embodiment 2
[0077] This embodiment provides a method for manufacturing a prefabricated door and window integrated laminated wall panel 1, which can be applied to fabricate the laminated wall panel 1 of Example 1. The method includes steps:
[0078] S101 , arranging the side forms of the first prefabricated layer 11 .
[0079] The side forms enclose the pouring space of the first precast layer 11, and the first precast layer 11 is formed by pouring concrete into the space enclosed by the side forms. The way of arranging the side forms of the first prefabricated layer 11 can be adopted. On the platform made of the first prefabricated layer 11, referred to as the mold table for short, the positioning lines are drawn, and then the side forms are arranged along the positioning lines. If the side formwork is arranged separately, the side formwork is a magnetic side formwork; if the side formwork is an ordinary side formwork, the magnetic box needs to be fixed while arranging the side formwork. ...
Embodiment 3
[0108] Please also refer to Figure 6 and Figure 7 , Figure 6 and Figure 7 Together they constitute a schematic diagram of the overall cross-sectional structure of the prefabricated door and window integrated laminated wall panel 1 .
[0109] The difference between this embodiment and Embodiment 1 is that the prefabricated door and window integrated laminated wall panel 1 of this embodiment also includes an insulation layer 19 and an insulation connector 20 . The first prefabricated layer 11, the insulation layer 19, the concrete layer 13 and the second prefabricated layer 12 are stacked in sequence. The first prefabricated layer 11 , the second prefabricated layer 12 and the concrete layer 13 are embedded with formed reinforcing ribs. Formed reinforcing ribs are respectively embedded in the first prefabricated layer 11, the second prefabricated layer 12 and the concrete layer 13, as the skeleton of the laminated wall panel 1, used to enhance the structural support stre...