Energy dissipation device, energy dissipation system and construction method for anti-compaction spreading and paving construction of hydraulic fill area

An energy-dissipating device and anti-crowding technology, which is applied to earth movers/shovels, mechanically driven excavators/dredgers, buildings, etc., can solve the problem of reducing the flow rate of dredging fill and increasing the coverage area of ​​dredging fill , low production cost and other issues

Pending Publication Date: 2019-09-20
CCCC TIANJIN DREDGING HARBOR CONSTR ENG
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the problems existing in the prior art, the present invention provides a method to reduce the flow rate of the blow-fill, increase the coverage area of ​​a single blow-fill of the blow-fill, concentrate the outflow direction of the blow-fill, facilitate the adjustment of the position of the blow-fill system, and solve the problem of low production cost. Energy dissipation device, energy dissipation system and construction method for anti-squeeze and silt laying construction in thick silt substrate dredging reclamation area to solve the problem of traditional dredging and silting in dredging reclamation area with thick silt substrate

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Energy dissipation device, energy dissipation system and construction method for anti-compaction spreading and paving construction of hydraulic fill area
  • Energy dissipation device, energy dissipation system and construction method for anti-compaction spreading and paving construction of hydraulic fill area
  • Energy dissipation device, energy dissipation system and construction method for anti-compaction spreading and paving construction of hydraulic fill area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0044] Example: such as Figure 5 As shown, the bottom of a dredging reclamation area is about 10 meters of silt, which needs to be dredged and filled with medium-coarse sand with a thickness of 7 meters to form a land area. According to theoretical calculations, the silt cannot withstand a one-time loading of 1.5 meters thick medium-coarse sand, otherwise it will easily cause silt extrusion. Therefore, it is impossible to adopt the traditional dredging filling process for construction, and it needs to be filled in layers. The thickness of each layer should not exceed 1.5 meters. After the layer is stable, the next layer can be filled. Adopt the technical scheme of the present invention to carry out loose paving blowing and filling:

[0045] The bow blowing construction technology of the trailing suction dredger is adopted, the flow rate of the 9 outlets of the mud delivery pipe is 5m / s, and the diameter of the 9 outlets of the mud delivery pipe is 900mm. The number of energ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an energy dissipation device, energy dissipation system and construction method for anti-compaction spreading and paving construction of a hydraulic fill area, further discloses a spreading and paving construction system and a spreading and paving construction method, and belongs to the field of thick sludge substrate hydraulic fill. The energy dissipation device comprises an energy dissipation device body. The energy dissipation device body comprises a bent pipe joint, wherein one end of the bent pipe joint is connected with a mud conveying pipe, and the other end of the bent pipe joint is connected with an energy dissipation chamber internally provided with a cavity. A plurality of energy dissipation holes are uniformly distributed in the side wall of one side of the energy dissipation chamber. An energy dissipation box with an opening at the lower end is arranged outside the energy dissipation holes and comprises an energy dissipation box parallel to the sections of the energy dissipation holes. A top plate is connected with the energy dissipation plate and the side wall of the energy dissipation chamber. Side plates are arranged at the two ends in the horizontal direction of the energy dissipation plate and are connected with the energy dissipation plate and the side wall of the energy dissipation chamber. By means of the energy dissipation device, energy dissipation system and construction method for anti-compaction spreading and paving construction of the hydraulic fill area, the spreading and paving construction system and the spreading and paving construction method, the flow speed of hydraulic fill objects is reduced, the single-time hydraulic fill coverage area of the filling objects is increased, the discharging direction of the hydraulic fill objects is centralized, the position of a hydraulic fill system can be conveniently adjusted, and the problem of compaction of traditional hydraulic fill of a thick sludge substrate hydraulic fill area is solved.

Description

technical field [0001] The invention belongs to the field of dredging and reclamation areas with thick silt bottom, and in particular relates to an energy dissipation device, an energy dissipation system and a construction method for anti-crowding and silt laying construction in a dredging and filling area with thick silt bottom. Background technique [0002] As there are more and more land reclamation projects in coastal areas, it is necessary to reclamation from the sea to form land areas, build factories, port yards, roads, and real estate development projects. Most of the dredged filling soil is sandy soil, so that after the sand blowing pipeline is removed, machinery and equipment can be put on land for onshore construction soon. [0003] In traditional reclamation projects, the excavation system and pumping system of cutter suction dredgers or trailing suction dredgers are mainly used to transport the sediment several kilometers away to the designated reclamation area ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More