Foundation ditch drainage type sprayed concrete structure and construction method thereof
A technology of shotcrete and concrete layer, which is applied in basic structure engineering, excavation, construction, etc. It can solve the problems of waste of concrete materials, long construction period, and loss of concrete, and achieves convenient installation and disassembly, good waterproof effect, and high degree of firmness. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] figure 1 It shows the foundation pit drainage type shotcrete structure of the present invention, which includes: a geotextile 1, which is fixed on the surface of the surrounding rock and soil S of the foundation pit through the first fixing member 2; specifically, the geotextile 1 is preferably set between the two guard piles 100, and the geotextile 1 is a filament geotextile with a width of 2-3m (preferably 2.5m) and a length of 2-3m (preferably 2.5m); at the same time, if the seepage area is too large Big, then described geotextile 1 has several pieces, and overlaps between adjacent two geotextiles 1, lap length is 10-15cm (preferably 12cm), and vertically every 40-60cm ( Preferably the 50cm) place is fixed with a third fastener (such as iron nails, etc., not shown), thus, the passage of soil particles can be prevented by the geotextile 1, thereby avoiding the blockage of the drainage channel, ensuring smooth drainage of the channel, and further , according to the si...
Embodiment 2
[0030] This embodiment also provides a construction method for the foundation pit drainage type shotcrete structure as described in Embodiment 1, which includes the following steps:
[0031] S1. The surrounding rock surface of the foundation pit is leveled, and blind ditch and sump are set;
[0032] S2. Fix the geotextile on the surface of the surrounding rock soil of the foundation pit, then fix the drainage board on the surface of the geotextile, and fix the steel mesh sheet on the surface of the drainage board; thus making the bedrock fissure The water is concentrated into the blind ditch and the sump through the drainage board, and then discharged to prevent water seepage;
[0033] S3. Spraying concrete onto the reinforcing mesh sheet to form a concrete layer, and leveling the surface by plastering.