Engineering supervision method and system
A supervision and engineering technology, applied in the field of engineering supervision methods and systems, can solve the problem of consuming a lot of manpower and time, and achieve the effect of reducing work intensity and improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] In one embodiment, as figure 1 As shown, the invention discloses a method for project supervision, which specifically includes the following steps:
[0050] S10: If the project supervision request is obtained, the construction scheme data is obtained from the project supervision request.
[0051]In this embodiment, the project supervision request refers to a request for the supervision unit to dispatch supervisors to carry out project supervision after the actual project starts or is ready to start. The construction scheme data refers to the scheme data prepared in advance to carry out the construction of the project. The construction scheme data includes the construction plan of the project, as well as the corresponding indicators to be completed and the completion time.
[0052] Specifically, the construction unit forms the construction plan data into the project supervision request, and after obtaining the project supervision request, obtains the construction plan ...
Embodiment 2
[0098] In an embodiment, a project supervision system is provided, and the project supervision system corresponds to the project supervision method in the above-mentioned embodiments one by one. Such as Figure 6 As shown, the project supervision system includes a construction plan acquisition module 10 , a data import module 20 , a comparison module 30 and a report sending module 40 . The detailed description of each functional module is as follows:
[0099] The construction scheme acquisition module 10 is used to obtain the construction scheme data from the engineering supervision request if the engineering supervision request is obtained;
[0100] The data import module 20 is used to obtain the scheme flow data from the construction scheme data, call the preset project supervision template, import the scheme flow data into the project supervision template, and obtain the supervision comparison template;
[0101] The comparison module 30 is used to obtain corresponding con...