Manual pipe-jacking construction method for shallow covering large-pipe-diameter high-water-level pipe beneath existing road

A technology with large pipe diameter and high water level, which is applied in the direction of waterway system, sewer pipe system, pipeline laying and maintenance, etc. It can solve the unavoidable damage and restoration of existing roads and underground pipelines, poor foundation bearing capacity and stability, pipeline foundation Disturbance and other problems, to achieve the effect of ensuring the bearing capacity and stability of the foundation, little impact, and reducing construction procedures

Pending Publication Date: 2019-10-22
CHINA RAILWAY CONSTR GRP BEIJING ENG CO LTD +1
View PDF0 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the rapid development of urbanization in my country, more and more new underground pipelines need to pass through existing buildings (structures) and roads. For the traditional large-scale excavation and buried pipeline construction, first, manual excavation is required. layer, and thus cannot satisfy the laying of various large pipelines that cannot be slotted due to the influence of the geological structure of the strata they pass through, the height of the groundwater level, the size of the pipe diameter, and the thickness of the soil on the top of the pipe. Second, the construction site is large and cannot Avoid damage and restoration of existing roads and underground pipelines, which will lead to waste of resources, increase construction procedures, increase the overall cost and prolong the construction period. Ensure that the bearing capacity and stability of the foundation after the pipeline is installed are poor

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Manual pipe-jacking construction method for shallow covering large-pipe-diameter high-water-level pipe beneath existing road
  • Manual pipe-jacking construction method for shallow covering large-pipe-diameter high-water-level pipe beneath existing road
  • Manual pipe-jacking construction method for shallow covering large-pipe-diameter high-water-level pipe beneath existing road

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0040] see Figure 1-9 , an artificial pipe jacking construction method for shallow-covered soil, large pipe diameter and high water level piercing existing roads, comprising the following steps:

[0041] Step 1. Construction preparation. Determine the construction length of the pipe jacking to be 30m and the inner diameter of the pipe to be 2m. According to the thickness of the covering soil from the top of the pipe to the road surface of 3m, the groundwater ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a manual pipe-jacking construction method for a shallow covering large-pipe-diameter high-water-level pipe beneath an existing road. The manual pipe-jacking construction methodfor the shallow covering large-pipe-diameter high-water-level pipe beneath the existing road comprises the following steps that conducting preparation for construction, determining a dewatering scheme, reasonably arranging a dewatering well, digging a pipe-jacking work well, constructing a back wall, installing pipe-jacking equipment, conducting advanced ductule grouting, conducting digging and jacking construction, conducting post-grouting construction and monitoring ground subsidence. The manual pipe-jacking construction method for the shallow covering large-pipe-diameter high-water-level pipe beneath the existing road has the beneficial effects that the construction site is small, the existing road and underground pipelines are prevented from being damaged, recovery is not needed, resource waste is completely eradicated, construction procedures are reduced, the comprehensive cost is effectively lowered, and the work period is effectively shortened; and meanwhile, manual pipe jacking causes quite little disturbance in a pipeline foundation, and therefore the foundation bearing cavity and stability are guaranteed after pipeline installation.

Description

technical field [0001] The invention relates to an artificial pipe jacking construction method, in particular to an artificial pipe jacking construction method for shallow-covered soil with a large pipe diameter and high water level penetrating existing roads, and belongs to the technical field of road construction. Background technique [0002] With the rapid development of urbanization in my country, more and more new underground pipelines need to pass through existing buildings (structures) and roads. For the traditional large-scale excavation and buried pipeline construction, first, manual excavation is required. layer, and thus cannot satisfy the laying of various large pipelines that cannot be slotted due to the influence of the geological structure of the strata they pass through, the height of the groundwater level, the size of the pipe diameter, and the thickness of the soil on the top of the pipe. Second, the construction site is large and cannot Avoid damage and res...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E03F3/06E02D19/10F16L1/028F16L1/06
CPCE02D19/10E03F3/06F16L1/028F16L1/06
Inventor 陈明洋邓玉萍崔跃黎佺炜李照祺
Owner CHINA RAILWAY CONSTR GRP BEIJING ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products