A coal-pillar-free mining method for ultra-high water material filling working face gangue pumping and retaining roadway
A technology of filling work and mining method, which is applied in the direction of filling, ground mining, mining equipment, etc., to achieve the effect of increasing the recovery rate, solving the tension of mining replacement, and weakening the intensity of mine pressure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0021] Such as figure 1 , figure 2 As shown, a coal pillar-free mining method for gangue pumping and retaining lanes in the working face filled with ultra-high water materials includes the following steps:
[0022] a. Establish an ultra-high water material filling pump station in the mine industrial square, and equip a complete ultra-high water material filling system to ensure the continuous filling of ultra-high water material 7;
[0023] b. Establish mine gangue pumping and filling system under the mine. The raw coal mined at the working face is sorted underground, and the sorted coal is transported to the surface. Go to the underground gangue treatment chamber, mix with super high water material and cement material after crushing to make pumping gangue filling body 8, and reach the side of the gob mining roadway behind the work...
PUM