Hoisting operation method for mounting and constructing ultra-large arc gate in flood discharge tunnel
A hoisting method and super-large arc technology, applied in water conservancy projects, marine engineering, coastline protection, etc., can solve the problems of large-scale lifting equipment that cannot be deployed, cannot be directly hoisted in place, and the size of components is large.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The present invention is described in further detail below by embodiment, and embodiment is only used for illustrating the present invention, does not limit the scope of the present invention.
[0047] like Figure 1-9 The hoisting method shown in a super-large arc door opening includes the following steps: 1) measuring the effective space in the opening and setting out the installation reference; using a total station, theodolite, steel ruler, steel tape, etc. to measure An instrument tool to measure the space of the flood tunnel lock chamber. Based on the original datum points reserved for civil engineering, survey and draw the arc gate slot centerline, installation longitudinal centerline, bottom sill mileage elevation, support hinge installation mileage elevation span and slope, and the installation of the hoisting cylinder on the hoisting platform. Mileage, elevation, span, etc., and leave detection and control reference points on the permanent foundations such as...