Ship double-layer bottom subsection construction method
A technology of segmented construction and double bottom, applied in the direction of ships, etc., can solve the problem of difficult to control the flatness of the inner bottom surface, and achieve the effect of strong versatility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0037] Understandably, see attached figure 2 , the embodiment of the present invention is described based on the cross-sectional view of the double bottom segmental construction process, which does not indicate or imply that the method must be operated in a specific orientation, so it should not be construed as a limitation of the present invention.
[0038] Such as Figure 1 to Figure 2 As shown, the preferred embodiment of the embodiment of the present invention provides a segmented construction method for a ship's double bottom, comprising the following steps:
[0039] Plan the segmented construction site according to the frame diagram of the double bottom of the shi...