Highway guardrail and construction method thereof
A technology for highway guardrails and vertical directions, which is applied to roads, roads, road safety devices, etc., can solve problems affecting the stability and safety of roadbeds, inconvenient construction, complex construction, etc., and achieve improved impact resistance, convenient construction, and low cost. low effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Such as figure 1 As shown, a highway guardrail includes a column 1, an anti-blocking block 2 and a corrugated beam plate 3, the anti-blocking block 2 is arranged on the column 1, and the column 1 is a hollow structure with an upper end opening; the corrugated beam plate 3 is arranged on the anti-blocking block 2 on.
[0045] Such as figure 2 , 3As shown, the column 1 is provided with a mounting hole 11 along the vertical direction, and an adjusting block 4 is slidingly arranged in the column 1 along the length direction of the mounting hole 11; The positioning assembly 5 includes a positioning bolt 51 and a positioning nut 52 . An adjustment hole 41 penetrating through the adjustment block 4 is opened on the adjustment block 4 , and a positioning bolt 51 is passed through the adjustment hole 41 . The side wall of the anti-blocking block 2 is provided with a positioning hole 21 for the positioning bolt 51 to pass through, and the positioning bolt 51 passes through t...
Embodiment 2
[0059] A construction method for a road guardrail, comprising the following steps:
[0060] S1. Stakeout, under the responsibility of the engineer, according to the requirements of the design drawings, carry out stakeout according to the construction layout drawing;
[0061] S2. Piling of column 1 and excavation of foundation pit. After the sample is placed, piling of column 1 and excavation of foundation pit of column 1 are carried out according to the sample line;
[0062] S3, bury pile, bury column 1;
[0063] S4. Install the guardrail. The guardrail components should be erected according to the design drawing, and a smooth and continuous installation effect should be achieved. All lap joints should be spliced in the direction of the vehicle;
[0064] S5. Guardrail adjustment, under the supervision of the engineer, adjust the overall line shape of the guardrail. The top surface of the wave beam should be in harmony with the line shape of the road. After the adjustment, t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com