Platform and method for testing intelligent substation based on electromagnetic transient real-time simulation
A technology of smart substation and real-time simulation, applied in the field of smart substation, can solve problems such as being difficult to be used as an effective test tool and not paying attention to key events of the total station communication network, and achieve the effect of improving the depth and quality of debugging and improving confidence.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] This embodiment provides a smart substation test platform based on electromagnetic transient real-time simulation, such as figure 1 As shown, it includes: a smart substation real-time simulator and an intelligent signal conversion device, wherein the smart substation real-time simulator is used to simulate the operation scene of the actual secondary system of the smart substation through electromagnetic transient simulation, and is the actual secondary system of the smart substation under test. The system provides a virtual operating environment, and common grid faults can be preset in the smart substation real-time simulator.
[0031] The intelligent signal conversion device is used to receive the data information generated by the intelligent substation real-time simulator in real time, and send it to the actual secondary system of the intelligent substation under test after format conversion, and receive the actual data information of the intelligent substation under t...
Embodiment 2
[0054] This embodiment provides a smart substation testing method based on electromagnetic transient real-time simulation, including:
[0055] Simulate the operation scenario of the actual secondary system of the smart substation through electromagnetic transient simulation, provide a virtual operating environment for the actual secondary system of the smart substation under test, and preset common grid faults;
[0056] Receive the data information during the simulation operation in real time, and send it to the actual secondary system of the smart substation under test after format conversion;
[0057] The actual secondary system of the smart substation under test sends a response message to the preset grid fault, thereby realizing a closed-loop test.
[0058] Among them, the simulation of the operation scene of the actual secondary system of the smart substation by the electromagnetic transient simulation method is realized by the smart substation real-time simulator, and th...
PUM
![No PUM](https://static-eureka.patsnap.com/ssr/23.2.0/_nuxt/noPUMSmall.5c5f49c7.png)
Abstract
Description
Claims
Application Information
![application no application](https://static-eureka.patsnap.com/ssr/23.2.0/_nuxt/application.06fe782c.png)
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com