A sampling device for soil quality analysis of cliff walls used in civil engineering
A technology of cliff walls and civil engineering, applied in the direction of sampling devices, etc., can solve problems such as limited focus, large cliffs, and difficulties in soil extraction, and achieve the effects of reducing load, improving stability, and reducing soil residues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] Specifically, the vehicle body design is adopted to facilitate the overall movement of the device.
Embodiment 2
[0074] The left and right ends of the vehicle plate 101 are respectively fixed with a left support plate 201 and a right support plate 202, and between the left support plate 201 and the right support plate 202
[0076] Wherein, the rotating assembly 3 includes a No. 1 electric reel 301, a No. 1 pull rope 302, a hinge seat 303, a rotating rod 304,
[0077] The top left end of the moving block 205 is fixed with a hinge seat 303, and the top right end is installed with a No. electric wire take-up wheel 301;
[0080] After the soil extraction is completed, the position of the moving block 205 is moved to the left by the displacement assembly 2, so that the sampling assembly 5 is separated from the rock wall. No. 1 electricity
[0081] In order to provide better support and facilitate the movement of the rotating rod 304, the top of the left side plate 201 is connected with several second-class
[0082] It should be noted that when the rotating rod 304 is rotated and pressed on the su...
Embodiment 3