A method of rapidly compacting building foundations
A foundation and construction technology, applied in construction, soil protection, infrastructure engineering, etc., can solve the problems of time-consuming adjustment, heavy physical labor, laborious and laborious, etc., to improve the quality and efficiency of tamping, improve the efficiency of tamping, The effect of saving human resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Such as figure 1 Shown, a kind of method of fast tamping building foundation, this tamping method comprises the steps:
[0051] S1. Move the tamping device to the working position: connect the support plate to the tractor, connect the support plate to the tractor through the traction frame connected to one side of the support plate, and drive the tamping device to the working position through the tractor;
[0052] S2. Adjust the protruding length of the beam: adjust the protruding length of one end of the beam to move the beam so that the side of the auxiliary pressure plate at one end of the beam exceeds the side of the tractor;
[0053] S3. Fixing the beam and the hollow casing: fixing the relative position of the beam and the hollow casing by fixing pins;
[0054] S4. Perform compaction operation on the building foundation: work through the electric cylinder or hydraulic cylinder, and drive the support plate and support frame to move through the tractor, and perform...
Embodiment 2
[0063] A method for rapidly compacting a building foundation, the compacting method comprising the steps of:
[0064] S1. Move the tamping device to the working position: connect the support plate to the tractor, connect the support plate to the tractor through the traction frame connected to one side of the support plate, and drive the tamping device to the working position through the tractor;
[0065] S2. Adjust the protruding length of the beam: adjust the protruding length of one end of the beam to move the beam so that the side of the auxiliary pressure plate at one end of the beam exceeds the side of the tractor;
[0066] S3. Fixing the beam and the hollow casing: fixing the relative position of the beam and the hollow casing by fixing pins;
[0067] S4. Perform compaction operation on the building foundation: work through the electric cylinder or hydraulic cylinder, and drive the support plate and support frame to move through the tractor, and perform compaction operat...