Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Semi-assembled pipe curtain structure based on steel reinforced concrete connection and construction process

A concrete-filled steel tube and reinforced concrete technology, which is applied to shaft equipment, earth-moving drilling, wellbore lining, etc., can solve the problems of inability to guarantee the bearing capacity and rigidity of the tube curtain structure, lack of concrete in the connecting steel tube, and insufficient concrete pouring, etc. The effect of ensuring the quality of concrete pouring, controlling the surface settlement, and convenient and quick construction

Active Publication Date: 2020-04-03
NORTHEASTERN UNIV
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, when the cross-sectional size of the connected steel pipes is small, or the horizontal distance between large steel pipes is large, there may still be insufficient concrete pouring in the connected steel pipes, or even the lack of concrete in the connected steel pipes, which also cannot guarantee the pipe curtain structure. Good bearing capacity and rigidity will also bring safety hazards to subsequent underground construction
In view of the shortcomings of the above-mentioned pipe curtain structure and the difficulties in construction, it is of great practical significance to develop a new pipe curtain structure with simple construction and guaranteed quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Semi-assembled pipe curtain structure based on steel reinforced concrete connection and construction process
  • Semi-assembled pipe curtain structure based on steel reinforced concrete connection and construction process
  • Semi-assembled pipe curtain structure based on steel reinforced concrete connection and construction process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0044] The prefabricated connecting member in this embodiment is a reinforced concrete connecting member with built-in section steel, and the section steel in this embodiment is an I-beam.

[0045] Such as Figure 1 to Figure 7 As shown, the semi-assembled tube curtain structure based on the steel-concrete connection includes a lateral support structure and a lateral support structure. The lateral support structure is used to support the lateral surrounding rock, and the lateral support structure is used to support the ground. The adjacent lateral support structures are connected by a lateral support structure. The lateral support structure and the lateral support structure are the same, and both include a plurality of large steel pipes 1, and the adjacent large steel pipes 1 are connected by prefabricated connecting members. The number and diameter of the connecting members are determined by calculation of the distance and diameter between adjacent large steel pipes 1, and the ax...

Embodiment 2

[0059] The difference between this embodiment and embodiment 1 is that the cross section of the reinforced concrete connecting member with built-in section steel is circular, such as Figure 8 to Figure 10 Shown.

Embodiment 3

[0061] The prefabricated connecting member in this embodiment is a steel tube concrete connecting member with built-in section steel, and the section steel in this embodiment is an I-beam.

[0062] Figure 11 to Figure 16 As shown, the semi-assembled tube curtain structure based on the steel-concrete connection includes a lateral support structure and a lateral support structure. The lateral support structure is used to support the lateral surrounding rock, and the lateral support structure is used to support the ground. The lateral support structures are connected by a lateral support structure. The lateral support structure and the lateral support structure include a number of large steel pipes 1, and the adjacent large steel pipes 1 are connected by prefabricated connecting members. The section of the prefabricated connecting members is It is circular, and the axis of the prefabricated connecting member is perpendicular to the axis of the large steel tube 1. The large steel tu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a semi-assembled pipe curtain structure based on a steel reinforced concrete connection. The semi-assembled pipe curtain structure comprises lateral supporting structures and atransverse supporting structure, wherein the lateral supporting structures are used for supporting lateral surrounding rock, the transverse supporting structure is used for supporting the ground, thelateral supporting structures are connected through the transverse supporting structure, each of the lateral supporting structure and the transverse supporting structure comprise a plurality of largesteel pipes, the adjacent large steel pipes are connected through a prefabricated connecting component, and concretes I are filled in the large steel pipes for packaging the prefabricated connectingcomponent. The construction process of the semi-assembled pipe curtain structure based on the steel reinforced concrete connection comprises the following steps of 1, manufacturing a working well; 2,prefabricated connecting members outside the field; 3, installing a pipe curtain; 4, forming a pipe curtain structure; and 5, grouting reinforcement treatment and building a building. The manufacturing process of the prefabricated connecting component is standardized, the concrete pouring quality of the prefabricated connecting component is guaranteed, and the phenomena of insufficient concrete pouring compactness and internal concrete missing are avoided.

Description

Technical field [0001] The invention belongs to the technical field of underground engineering construction, and specifically relates to a semi-assembled pipe curtain structure based on a section steel concrete connection and a construction process. Background technique [0002] The pipe-curtain method is based on the jacking of a single steel pipe in the underground soil structure. The pipe jacking technology is used to jack multiple close-packed large-diameter steel pipes around the proposed underground building. Cut through the operation holes of the steel bars and clean the slag between the steel pipes, manually clean the slag in the large steel pipes and between the steel pipes, and then penetrate the bolts or steel bars between the large steel pipes, and then, in the large steel pipes Concrete is poured between the steel tubes on site, and reinforced concrete beams (slabs) are used to connect the large steel tube concrete horizontally to form a steel tube curtain structure....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/00E21D11/10E21D11/08
CPCE21D11/006E21D11/08E21D11/10
Inventor 王连广李雪王一博刘姝田宇琳刚明慧陈百玲
Owner NORTHEASTERN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products