Building material equipment manufacturing process optimized scheduling method based on energy consumption clustering
A technology of manufacturing process and energy consumption, applied in the field of optimization and scheduling of building materials equipment manufacturing process based on energy consumption clustering, can solve problems such as short delay time of construction period, reduce manufacturing energy consumption cost, shortest total construction period delay time, and shorten construction period The effect of delay time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0039] like figure 1 Shown is a schematic flowchart of a method for optimizing and scheduling a manufacturing process of building materials equipment based on energy consumption clustering provided by an embodiment of the present invention. The scheduling method is an optimal scheduling method in the manufacturing process of building materials equipment based on energy consumption clustering, and t...