[0027] Such as Figure 1 to Figure 4 Shown, the construction method of large-scale steel chimney high-altitude combination of the present invention is the method that several sections chimneys are vertically welded together, and it comprises the following steps:
[0028] (a), several sections of chimneys that are adjacently connected are laid flat on the ground in turn, and several sections of chimneys include: a top section cylinder 1, a middle section cylinder 5 and a bottom section cylinder 4, in the top section An annular upper end plate 3 is welded on the inner wall of the top section cylinder body 1 at the bottom of the cylinder body 1, and an arc-shaped ring plate 6 is welded on the inner wall of the bottom section cylinder body 4 at the upper end of the bottom section cylinder body 4, and the arc-shaped ring plate 6 extends from the bottom section The inner wall of the cylinder body 4 protrudes outwards, and the end of the protruding arc-shaped ring plate 6 is welded w...