Embodiment 1
[0045] A destructive test method for a hollow floor gypsum filled box, comprising the following steps:
[0046] Step 1, test preparation, has the following process:
[0047] S1, site selection, choose an open space with a length of 7.38m and a width of 5.4m, and level the open space with cushion;
[0048] S2, design, one-to-one reinforcement according to the layout of the construction design drawing, and calculate the amount of concrete according to the large-scale drawing;
[0049] S3, material preparation, material preparation is divided into the following four parts:
[0050] The first part, the formwork configuration, lays the waste and flat formwork on the cushion;
[0051] The second part is the configuration of steel bars. It is equipped with slab bars with a diameter of 8mm and a spacing of 200mm and rib beam ties with a diameter of 6.5mm and a spacing of 250mm. Among them, the slab bars and rib beam ties are all grade 3 steel materials;
[0052] The third part is t...
Embodiment 2
[0071] In order to make the disclosure of the technical solution of the present application more sufficient and the description of the technical means richer and more detailed, some technical solutions are further defined and supplemented on the basis of the above-mentioned embodiment 1. Specifically, some technical features of the supplementary description are as follows: , in the step four, the test phenomenon is the following three parts:
[0072] Part 1, compare the weight of two gypsum mold boxes as the test object after they are fully wetted before concrete pouring and the weight of the gypsum mold boxes filled in the hollow slab formed by the concrete layer whose strength reaches more than 50%;
[0073] Part 2, observe the smoothness of the inner surface of the hollow slab after cutting and taking out the gypsum mold box, and whether there is segregation due to dehydration and the phenomenon of honeycomb pitting;
[0074] Part 3, observe whether the combination of the g...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com