Multimode resource limited project scheduling method using hierarchical adaptive intelligent algorithm
An intelligent algorithm and resource-constrained technology, which is applied in the fields of computer technology, information technology and system engineering, can solve problems such as low solution efficiency, incomplete search space, and inability to dynamically adapt to population changes.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0135] Combine below figure 1 , figure 2 The present invention will be further described in detail with reference to and examples, but the present invention is not limited to the following examples.
[0136] A project consists of 12 tasks numbered from 0 to 11, and its task structure, that is, the timing relationship between tasks is as follows: figure 2 shown, where t 0 and t 11 It is an artificially added virtual task, that is, it does not occupy the project duration or resources, t 1 to t 10 Table 1 shows the executable mode of , the time required for execution in this mode, and the number of renewable resources and non-renewable resources occupied. In this project, the available amount of renewable resource 1 at any time is 18, the available amount of renewable resource 2 at any time is 16, the available amount of non-renewable resource 1 in the entire project duration is 61, and cannot be updated Resource 2 has an available quantity of 62 throughout the project du...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com