A kind of antirust agent preparation equipment for electric power engineering construction
A technology of electric power engineering and anti-rust agent, which is applied in the field of electric power engineering, can solve the problems of uneven proportioning of anti-rust agent, anti-rust time error, shorten anti-rust time, etc., to achieve easy protection, reduce error, prevent rust The effect of lower deposition
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Example 1: Please refer to Figure 1-Figure 6 , the specific embodiments of the present invention are as follows:
[0031] Its structure includes a bracket 1, an outer frame 2, a preparation structure 3, an upper cover 4, a transmission box 5, and a motor 6. The bracket 1 is installed on the outer lower end of the outer frame 2 and is connected by a hinge. The outer frame 2 is sleeved on the preparation The outer lower end of the structure 3 is welded, the upper cover 4 is horizontally installed on the upper end of the preparation structure 3 and mechanically connected, the transmission box 5 is vertically installed on the upper end of the upper cover 4, the motor 6 is embedded in the inner side of the transmission box 5 and The preparation structure 3 includes a bottom cover 31, a flange 32, a tank body 33, a feed port 34, and a stirring structure 35, and the bottom cover 31 is installed on the lower end of the flange 32 and fixed by bolts, The flange 32 is located at...
Embodiment 2
[0038] Example 2: Please refer to Figure 1-Figure 3 , Figure 7-Figure 10 , the specific embodiments of the present invention are as follows:
[0039] Its structure includes a bracket 1, an outer frame 2, a preparation structure 3, an upper cover 4, a transmission box 5, and a motor 6. The bracket 1 is installed on the outer lower end of the outer frame 2 and is connected by a hinge. The outer frame 2 is sleeved on the preparation The outer lower end of the structure 3 is welded, the upper cover 4 is horizontally installed on the upper end of the preparation structure 3 and mechanically connected, the transmission box 5 is vertically installed on the upper end of the upper cover 4, the motor 6 is embedded in the inner side of the transmission box 5 and The preparation structure 3 includes a bottom cover 31, a flange 32, a tank body 33, a feed port 34, and a stirring structure 35, and the bottom cover 31 is installed on the lower end of the flange 32 and fixed by bolts, The fl...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


