Device and construction method for preventing upper soil settlement of pipe curtain structure
A technology of pipe curtain and soil body, which is applied in the direction of earth drilling and mining, supporting the top beam of the mine roof, mine roof support, etc., and can solve the problem of serious ground subsidence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0029] refer to figure 1 , the present invention provides a device for preventing the settlement of the upper part of the pipe curtain structure, by placing the frame on the bottom beam, and then adjusting the length of the jacking piece so that the two ends of the jacking piece are against the bottom beam and the bottom beam respectively The top beam, the bottom beam pushes down the soil during the process of pushing the jacking parts, so that the soil is compressed and compacted. At this time, the bottom beam sits on the compacted soil and will not settle itself due to the deformation of the soil, and The top of the jacking part also supports the top beam, so it can support the top beam and the soil above the pipe curtain structure, prevent the soil above the pipe curtain structure from settling, and solve the serious problem of ground subsid...