Construction method and structure for prefabricated tubular pile to penetrate through karst cave

A technology of prefabricated pipe piles and construction methods, which is applied in the direction of foundation structure engineering, sheet pile walls, buildings, etc., can solve the problems of long construction period, high construction cost, and low bearing capacity, so as to save material loss, shorten construction period, The effect of reducing construction costs

Pending Publication Date: 2020-07-03
CCFED THE FIRST CONSTR & ENG
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Underground karst caves and soil caves are common in southern my country. This stratum is rich in groundwater, the geology is weak and its bearing capacity is low, so it is difficult to be used as the bearing layer at the bottom of prefabricated pipe piles.
Due to the deep burial depth of underground caves and karst caves, it is difficult for most prefabricated pipe piles to be constructed to the underground bedrock layer. There are many construction technologies for the reinforcement of underground karst caves and soil caves. Large-area reinforcement before pile construction is difficult to achieve targeted reinforcement of the bearing layer at the bottom of prefabricated pipe piles in karst caves. The construction period is long, the construction cost is high, waste of manpower and material resources, and the construction quality cannot be guaranteed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method and structure for prefabricated tubular pile to penetrate through karst cave

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

[0023] A construction method of the present invention is directed to a prefabricated pipe pile penetrating a karst cave, such as figure 1 As shown, the method is constructed as follows:

[0024] a. Drill holes at the top of the cave 1 until the bottom of the cave is below the bearing layer 2;

[0025] b. Inject the shell material 3 into the hole;

[0026] c. Insert the steel pipe 5 with the slurry holes 4 evenly distributed through the karst cave section from the orifice through the karst cave and insert it into the bottom of the hole;

[0027] d. Wait for the casing material 3 around the steel pipe 5 to be consolidated;

[0028] e. Extend the grouting pipe of the high-pressure grouting pump from the top of the steel pipe 5 to the bottom of the steel pipe, and inject the cement slurry 6 into the steel pipe 5 from the bottom to the top; ; ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method and structure for a prefabricated tubular pile to penetrate through a karst cave. Force of the prefabricated tubular pile (7) is directly transferred to aforce holding layer (2) at the bottom of the karst cave through a steel pipe (5) penetrating through the karst cave (1). The construction problems that in the process of constructing the prefabricated tubular pile in the karst cave, the prefabricated tubular pile is likely to sink and incline and the bearing capacity at the bottom of the pile does not meet design requirements are effectively solved, the effect of reinforcing a soil body of the karst cave can be effectively achieved, and the bearing capacity requirement of the bottom of the prefabricated tubular pile can be guaranteed. Meanwhile, the construction technology can be used for reinforcing the force holding layer of the pile bottom of the prefabricated tubular pile in the karst cave in a targeted manner, so that the construction period is shortened, the material loss is reduced, the construction cost is reduced, and the national green construction requirement is met.

Description

technical field [0001] The invention relates to a construction method and structure for a prefabricated pipe pile penetrating a karst cave, and belongs to the technical field of building foundation construction. Background technique [0002] Underground karst caves and soil caves are common in southern my country. The stratum is rich in groundwater, weak in geology and low in bearing capacity, making it difficult to be used as a bearing layer for the bottom of prefabricated tubular piles. Due to the deep buried depth of underground soil caves and karst caves, it is difficult for most prefabricated pipe piles to be constructed to the underground bedrock layer. There are many construction technologies for the reinforcement of underground karst caves and soil caves. It is difficult to reinforce the bearing layer at the bottom of the prefabricated pipe piles in the karst cave with a large area of ​​reinforcement before the pile construction. The construction period is long, the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/28E02D15/04
CPCE02D5/285E02D15/04
Inventor 崔浓辉孙瑞甲林荣运李红梅艾姣姣
Owner CCFED THE FIRST CONSTR & ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products