Jacket levelling construction process of offshore booster station
A technology of offshore step-up station and construction technology, which is applied in the direction of foundation structure engineering, building, sheet pile wall, etc., and achieves the effect of simple method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0024] The present invention provides a technical solution: a construction process for leveling the jacket of an offshore booster station, comprising the following steps:
[0025] Step 1: Transport the jacket to the construction site;
[0026] Step 2: Construction is carried out by two floating cranes and a piling construction ship, and one floating crane hangs the jacket throughout the whole process to ensure that the jacket is flat and as close as possible t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


