An optimization method for the installation of gapped conductor balance hanging wire

An optimization method and wire installation technology, which can be applied to the suspension device of the cable, the spatial arrangement/configuration of the cable, the overhead line/cable equipment, etc. The effect of improving the working environment

Active Publication Date: 2021-07-02
HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the problem of large workload increase caused by the operation sequence of the traditional wire balancing and hanging process, and proposes an optimization method for the installation of intermittent wire balancing and hanging wires, and greatly reduces the workload by changing the operation sequence and tightening the wire Shorten the construction period, use the special traction head for gap-type wires to crimp the aluminum layer and the steel core into a whole, and then use the wire pulley to directly tighten the wires on the ground, mark and crimp at high altitudes to reduce labor, improve efficiency, reduce labor intensity, and reduce high-altitude operations. , Improve the working environment and ensure construction safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • An optimization method for the installation of gapped conductor balance hanging wire
  • An optimization method for the installation of gapped conductor balance hanging wire
  • An optimization method for the installation of gapped conductor balance hanging wire

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0023] Embodiment: a method for optimizing the installation of interstitial wire balance hanging wires, including the following steps.

[0024] Step S1, construction preparation: determine the length of the replacement wire segment, the number and type of iron towers in the interval of the replacement wire segment, calculate the tension of the ground wire, and the wire lifting force of the attachment installation; determine the wire hanging scheme, the wire lifting scheme, and the type of construction tools installed and specifications;

[0025] There are 3 strain towers and two straight towers in the section of the replacement wire section, and there is a straight tower in the middle of each adjacent strain tower, numbered from left to right as 1#, 2#, 3#, 4# and 5#.

[0026] Step S2, such as figure 2 As shown, the construction tools are installed; the tools include crimping type traction head, fittings string, pulley group, tension pipe clamping pipe, steel core tight wir...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for optimizing the installation of intermittent wire balance hanging wires, which includes the following steps: S1. Construction preparation: determining the length of the replacement wire segment, the number and type of iron towers in the interval of the replacement wire segment, calculating the tension of the ground wire, and installing accessories. Wire force; determine the wire hanging scheme, wire lifting scheme, and the type and specification of installation construction tools; S2, installation of construction tools; S3, wire hanging and pressing operations; S4, tightening operations; S5, marking and crimping operations; replacement There are N tension towers in the section of the wire segment, and a straight tower is arranged in the middle of each adjacent tension tower, where N is an odd number. The program adopts changing the operation sequence and tightening method to greatly reduce the workload and shorten the construction period. The aluminum layer and the steel core are crimped into a whole by using the special traction head of the gap type wire, and then the wire is directly tightened on the ground and marked at high altitude through the wire pulley. , crimping to reduce labor, improve efficiency, and reduce labor intensity.

Description

technical field [0001] The invention relates to the field of construction technology of power transmission and transformation power lines, and in particular relates to an optimization method for installation of gapped wire balance hanging wires. Background technique [0002] With the rapid development of social economy, the transmission capacity of the original transmission line cannot meet the needs of current economic development, and the new line faces problems such as land requisition, high cost investment, and long construction period. The use of gap-type conductors can use the iron tower of the original line Only need to replace the suspension clamps and tension clamps, its low sag characteristics (both aluminum wire and steel core are made of heat-resistant materials) can avoid the safety distance between the wires and the ground and the crossing objects caused by the insufficient height of the original tower, The normal operating temperature of the wire can be greatl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02G1/04H02G7/05H02G7/02H02G7/20
CPCH02G1/04H02G7/02H02G7/05H02G7/20
Inventor 韦舒天高健汪敬国张相奇谢英男丁瀚王璞马向辉
Owner HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD