Close-fitting open and underground excavation combined subway station structure and construction method thereof

A technology for subway stations and construction methods, which is applied in basic structure engineering, underwater structures, artificial islands, etc., can solve the problems of difficult construction, high risk, and large range of cutting plots, so as to achieve low construction difficulty and risk, The effect of ensuring the progress of the project and reducing the difficulty of coordination

Pending Publication Date: 2020-07-28
成都市建筑设计研究院有限公司
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] To sum up, although the traditional open and concealed excavation combined station form can guarantee the feasibility, it has the following problems: the size and length of the excavation section are large, the construction is difficult and the risk is high; the line spacing is large, the cutting area is large, It has a great impact on urban planning, and the number of buildings passing through it has increased; equipment layout is difficult, or the equipment has high functional requirements; the main functional areas are scattered or connected by passages, which makes operation and management inconvenient and building functions lack; the choice of construction methods in adjacent areas is restricted Wait

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Close-fitting open and underground excavation combined subway station structure and construction method thereof
  • Close-fitting open and underground excavation combined subway station structure and construction method thereof
  • Close-fitting open and underground excavation combined subway station structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0063] See in turn Figure 1-Figure 11 , the present embodiment provides a close-fitting open and concealed excavation combined with a subway station structure and a construction method thereof for avoiding demolition. The underground excavation is carried out under the building and in the vicinity, and the rest is an open excavation, including the following steps:

[0064] Step 1: Determine the scope of open and concealed excavation and the boundary line 14 according to the requirements of the construction work space and the safety protection of the building 1, as well as the structural joints;

[0065] Step 2: Set the open-cut enclosure pile 2 in the open-cut part, and support it with the excavation, and excavate to below the design position of the horizontal pipe shed 4;

[0066] Step 3: Carry out the construction of the excavated horizontal pipe shed 4 arranged laterally along the station on the open and undercut enclosure pile 2 at the longitudinal boundary of the open an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of subway design and construction, and provides a close-fitting open and underground excavation combined subway station structure and a construction method thereof.The close-fitting type open and underground excavation combined subway station structure and the construction method thereof aim to solve the problems of subway station land occupation, demolition, underground excavation scale control, construction difficulty control, risk control and the like. The construction method of the close-fitting open and underground excavation combined subway station comprises the following steps that an open and underground excavation ranges and boundaries are determined; the open excavation part is provided with fender posts; an underground excavation transverse pipe shed is constructed; excavating is carried out to a base of the open excavation part, an anti-pulling structure, a waterproof system and an open excavation main body are constructed, a steel bar connector is reserved at a connecting opening between open excavation and underground excavation, and backfilling and earthing are carried out; an advanced small pipe is constructed; the open excavationfender posts at the transverse boundary between open excavation and underground excavation are removed, and an underground excavation part is constructed longitudinally in pilot tunnels according toa bench cut method; an underground excavation secondary lining is constructed; and the open excavation fender posts and underground excavation primary supports at the longitudinal boundary between open excavation and underground excavation are removed in sections, and connecting structures and waterproof systems of a top plate and a bottom plate at the connecting opening between open excavation and underground excavation are constructed. The close-fitting type open and underground excavation combined subway station structure and the construction method thereof have the beneficial effects thatdemolition is avoided, risks and investment are controlled, the project progress is guaranteed and the coordination difficulty is reduced.

Description

technical field [0001] The invention relates to the field of subway design and construction, in particular to a close-fitting open and dark excavation combined subway station structure and a construction method thereof. Background technique [0002] Under the conditions of open-cut construction for subway stations, and when the roof is less covered with soil, the open-cut construction is generally less difficult, less risky, faster and more economical. With the rapid development of rail transit construction in major cities, the subway network is becoming more and more dense. Affected by environmental conditions, geological conditions and other factors, the structural layout of stations is diversified. The construction method has also gradually developed from the simple and direct open cut method to the full cover excavation method, half cover excavation method, concealed excavation method and combined open and concealed excavation method. However, in the bustling areas of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D13/00E21D13/02E21D11/00E21D11/10E02D29/045
CPCE21D13/00E21D11/00E21D11/10E21D11/38E02D29/04
Inventor 李冀伟吴起何伟唐凯卢致强钟扬刘建伟申小兵曹平程韬刘洋李果刘春宇曾理彬张骐
Owner 成都市建筑设计研究院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products