Parallel test method, device and system for multiple business projects

A technology of business items and testing methods, which is applied to devices and systems, and the field of parallel testing methods for multiple business items, and can solve problems such as the inability to perform parallel testing of multiple business items, and the time-consuming and labor-consuming process of building a test system.

Active Publication Date: 2020-07-28
SHISHI TONGYUN TECH CHENGDU CO LTD
View PDF8 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the inventor found in the process of realizing the present invention that the above-mentioned methods in the prior art have at least the following defects: since each set of R&D test environments is independent of each other, each set of R&D test environme...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Parallel test method, device and system for multiple business projects
  • Parallel test method, device and system for multiple business projects
  • Parallel test method, device and system for multiple business projects

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0099] figure 1 A flow chart of a method for parallel testing of multiple business items provided by Embodiment 1 of the present invention is shown. Such as figure 1 As shown, the method includes:

[0100] Step S110 : for each business project to be tested, deploy each target function module contained in the business project into the pre-created project lane environment corresponding to the business project.

[0101] Specifically, a project swim lane environment corresponding to each business item to be tested is generated in advance, and the project swim lane environment is used to implement a set of independent test environments. The project swimlane environment in the initial state is an empty environment. In order to realize the test function, it is necessary to further deploy each target function module included in the corresponding business project to the project swimlane environment. Wherein, each target function module is used to realize a specified business functio...

Embodiment 2

[0107] figure 2 It shows a flow chart of a parallel testing method for multiple business projects provided by Embodiment 2 of the present invention, as shown in figure 2 As shown, the method includes:

[0108] Step S200: For each business item to be tested, create a project swimlane environment corresponding to the business project, generate and store the environment identifier of the project swimlane identifier.

[0109] Specifically, in this embodiment, a corresponding project swim lane environment needs to be created for each service project to be tested. It can be seen that the number of project swimlane environments is equal to the number of business projects. Among them, the project lane environment refers to: a separate project test environment created through the lane management system. The lane management system is used to realize the unified management of multiple R&D test environments. Its overall structure is similar to the lane, so it is named the lane managem...

Embodiment 3

[0150] image 3 It shows a schematic structural diagram of a parallel testing device for multiple business items provided by Embodiment 3 of the present invention, and the device includes:

[0151] The deployment module 31 is adapted to deploy each target function module included in the business item to the pre-created project lane environment corresponding to the business item for each business item to be tested;

[0152] The request module 32 is adapted to make the target function module deployed in each project lane environment send a network test request including the environment identifier to the gateway device according to the obtained environment identifier of the project swimlane environment where the target function module is located, so as to For the gateway device to perform message routing according to the environment identifier contained in the received network test request.

[0153] Optionally, the deployment module is specifically adapted to:

[0154] Obtain e...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention discloses a parallel test method, device and system for a plurality of business projects, and relates to the field of electronic information, which comprises the following steps of: deploying each target function module contained in each business project into a pre-created project lane environment corresponding to the business project for each business project to betested; wherein a target function module deployed in each project swimming lane environment is configured according to an acquired environment identifier of the project swimming lane environment in which the target function module is located; and sending a network test request containing the environment identifier to gateway equipment, so that the gateway equipment performs message routing according to the environment identifier contained in the received network test request. A plurality of parallel project swimming lane environments can be realized in the same set of test system, so that thetest efficiency is greatly improved.

Description

technical field [0001] The embodiments of the present invention relate to the field of project testing, and in particular to a parallel testing method, device and system for multiple business projects. Background technique [0002] With the rapid development of business, it is often necessary to test multiple business projects in parallel. For example, in the continuous delivery process of agile R&D testing, it is not uncommon for multiple projects and multiple services to develop and test in parallel. However, the offline R&D and testing environment is relatively fixed and cannot satisfy the parallel development and testing of multiple projects or services at the same time. There may be dependencies between services. Once some services are unstable, it will affect the normal development progress of other dependent services, thereby affecting the overall R&D and testing efficiency. [0003] Therefore, in the prior art, in order to achieve the purpose of multi-project parall...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04L12/26
CPCH04L43/50
Inventor 祁万福何山易传佳
Owner SHISHI TONGYUN TECH CHENGDU CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products