Jacking frame overpass construction method based on self-anchored prestressed overhead system

A construction method and prestressing technology, which are applied in earth-moving drilling, climate change adaptation, wellbore lining, etc., can solve the problems that shield construction cannot be used, the overhead range of lines is large, and the structural net height is increased, so as to improve the safety protection level, The effect of ensuring construction safety and saving project costs

Active Publication Date: 2020-08-04
陕西铭捷交通工程有限公司
View PDF10 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] The existing problems in the construction of the overpass of the operating expressway: ①The expressway is restricted by conditions such as intercommunication or land acquisition, and it is impossible to implement temporary road relocation; and the operation department requires the entire road to be guaranteed, so it is impossible to implement half-width closure
②The burial depth of interchanges and expressways is not enough to implement tunnel shield construction
[0008] Problems existing in the construction of railway interchanges in operation: ①Limited by road slope and other conditions, it forms a shallow soil covering state with the railway to be handed over. It is more complicated to adopt measures to increase the net height of the structure, which has a greater impact on the safety of railway operations.
②Affected by the implementation conditions, shield construction cannot be used, and the excavation depth of sloping by overhead jacking is relatively deep, and the overhead range of the line is large, which has a great impact on the safety of railway operation. It is necessary to reduce the jacking excavation section
③The multi-line turnout area is affected by the turnout, and it is difficult to implement overhead, closure, and relocation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Jacking frame overpass construction method based on self-anchored prestressed overhead system
  • Jacking frame overpass construction method based on self-anchored prestressed overhead system
  • Jacking frame overpass construction method based on self-anchored prestressed overhead system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] In order to make the purpose, technical effects and technical solutions of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention are clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention; obviously, the described embodiments It is a part of the embodiment of the present invention. Based on the disclosed embodiments of the present invention, other embodiments obtained by persons of ordinary skill in the art without making creative efforts shall all fall within the protection scope of the present invention.

[0042] The invention relates to a construction method for jacking frame overpasses, in particular to the construction of a frame overpass that does not interrupt the operation of the expressway and does not change the expressway road during the construction of the jacking frame overpass under the existing expressway; The jackin...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a jacking frame overpass construction method based on a self-anchored prestressed overhead system. The method comprises the following steps: constructing and arranging gate-shaped anchoring piles on roadbed slopes at two sides of a highway or a railway; arranging a cross beam on the tops of the anchoring piles, and solidifying the cross beam and the anchoring piles to forma gate-shaped frame; driving guide steel pipes into reserved positioning holes of the gate-shaped frame to the opposite sides of roadbeds; penetrating prestressed steel bundles into the guide steel pipes to form the self-anchored prestressed gate-shaped frame overhead system; prefabricating overpass frame structure segments, and jacking the segments in place within the protection range of the self-anchored prestressed overhead system; and grouting on the periphery of the overpass frame structure, and making the overpass frame structure form a permanent stressed structure to bear railway or highway loads. The construction method provided by the invention can realize that the operation is not interrupted and a road is not changed when an existing highway or railway jacking frame overpass isconstructed.

Description

technical field [0001] The invention belongs to the technical field of jacking frame overpass construction, in particular to a jacking frame overpass construction method based on a self-anchored prestressed overhead system. Background technique [0002] Interchange jacking construction is a common construction method for road underpassing, and it is a common crossing form for new roads to pass under existing highways and railways. [0003] At present, the existing jacking interchange construction methods mainly include: [0004] (1) For the expressway, the way of changing the road is generally adopted. First, half of the overpass is closed, and then the main part of the half-overpass is constructed, and then moved to the other half for construction. For deep-buried overpasses, the tunnel shield construction method is adopted. [0005] (2) The construction method of overhead jacking is generally adopted for the railway, the tunnel shield form is adopted for the deep burial o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/00E21D11/04E21D11/14E21D11/10E01C1/04
CPCE01C1/04E21D11/00E21D11/003E21D11/04E21D11/10E21D11/14Y02A30/60
Inventor 孙杰苏威风
Owner 陕西铭捷交通工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products