Prefabricated offshore booster station upper module and construction method thereof
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- QINGDAO TGOOD ELECTRIC
- Publication Date
- 2020-08-04
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to an offshore booster station, in particular to a prefabricated offshore booster station upper block and a construction method thereof. Background technique
[0002] Wind power is currently the mainstream industry of clean energy in the international community. It has significant social and environmental benefits and is of great significance to promoting the development of renewable energy in my country. In recent years, the development of wind power has been developed from land to sea. The construction of offshore wind farms generally consists of five major parts: wind farms, cable circuits between wind farms, offshore booster stations, outgoing cables, and on-road centralized control centers. The hub, the offshore booster station gathers the core electrical equipment of the entire wind farm, and is also the core of manual daily maintenance and operation.
[0003] The offshore booster station is generally divided into the uppe...